Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Head loss and sunshine striking a pipeline cause the temperature of the water flowing inside to rise by 2 degrees Celsius between two measuring points. Find the heat gain in J/N and cal/N.
What pressure gradient is required to accelerate water vertically upward in a vertical pipe at a rate of 0.5g
An industrial waste water treatment plant discharges into a large river. the industrial waste water is at 1m^3/s and contains an ultimate BOD concentration of 300mg/L at a temperature of 30 degrees C and a DO concentration of 2.5mg/L
Assume that theta is given in degrees, and write the MATLAB statements to evaluate tan(theta) as long as the magnitude of cos( theta) is grater than or equal to 10^(-20). If the magnitude of cos(theta) is less than 10^(-20)
A 12-in well is drilled through a confined aquifer of average thickness 80 ft. Two observation wells located 50 and 120 ft away register a difference in drawdown of 10 ft. The steady-state pumping rate is 1000 gpm
A large company in the communication and publishing industry has quantified the relationship between the price of one of itsproducts and the demand for this product as Price = 150- 0.01 x Demand for an annual printing of this particular product.
draw shear and bending moment diagrams determine the maximum stress on the beam (E=2.0E+11Pa) a simply supported beam AB is 5 m long carrying a uniform distributed load of 10kn/m over a 4m span
If the mean and variance of discrete random uniform random variable X, are E(X) and V(X) respectively, what would the mean and variance of cX be in terms of E(X) and V(X) if c is a constant
A horizontal circular plate weighing 60-lb is suspended from three wires that are attached to a support at D and form 30 degree angles with the vertical. Determine the tension in each wire.
Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?
Primary treatment removes ~25 percent of the BOD. Calculate the volume (m3) and approximate hydraulic retention time (h) of the aeration basin required to run the plant as a "high rate" facility (F/M = 2 kg BOD/kg MLSS-day).
Use the Muskingum method to route a flood through a reach a river. The base flow is 100 cfs, and the incoming flood flow increases 50 cfs every 2 hr over a 6 hr period and the subsides at the same rate.
if shaft A have 1200N.m torque with 25cm diameter and the shaft B have diameter of 52cm what is the torque of shaft be
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd