Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A pipeline terminates in a nozzle of outlet diameter = 0.15 m. The free jet from the nozzle is deflected through 120º by a vane as shown. Water flow rate through this pipe is 0.25 m3/s. Ignoring friction, find the force exerted by the jet on the vane.
How do you calculate the force of water hitting a concrete cylindrical pole. The velocity of the water is 2 ft/s, the depth of the water is 10 ft, and diameter of the pole is 3 ft. So what would be the total force exerted on the pole by the water?
what is the probability that the vehicle pulling out will get in an accident with oncoming traffic?
What would be the Horizontal and vertical component from this acting force see diagram
Identical bricks 0.1m wide, and weighting 2kg are placed on a plate (assume the plate has neligible weight). Calculate the total weight (and force F required to balance the plate). How far from x=0 should F be placed so that the plate will not tip..
Wastewater is discharged into an aquifer. This wastewater contains 0.1 ppm atrazine (a common herbicide). The MCL of atrazine is 5 ppb, the density is 1.19 g/mL and the solubility is 50 ppm. 500 ft away from the plant effluent there is a permeable..
Describe some of the benefits of physical models and mock-ups. What data are required to measure the following cost-effectiveness, system effectiveness, operational availability, and life-cycle cost?
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
A 4000-m 3 /day conventional activated sludge plant has an influent with a BOD5 of 190 mg/L and SS of 225 mg/L. What population would this plant serve?
Transportation network, A power generator at a dam can send 300 megawatts to substation 1, can send 200 megawatts to substation 2, and can send 250 megawatts to substation 2
Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.
A delivery company accepts only rectangular boxes the sum of whose length and girth (perimeter of a cross section) are equal to 108cm. Find the dimensions of an acceptable box of a largest area.
Determine the basin dimensions (width, length, depth) for a detention time of 3 hours and a length to width ratio of 4 to 1. (use English units)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd