Find the exponential function of best fit

Assignment Help Applied Statistics
Reference no: EM131303489

Quadratic Regression (QR)

Data: On a particular day in April, 2012, the outdoor temperature was recorded at 8 times of the day, and the following table was compiled. REMARKS: The times are the hours since midnight. For instance, 7 means 7 am, and 13 means 1 pm.

Time of day (hour) x

Temperature (degrees F.) y

7

35

9

50

11

56

13

59

14

61

17

62

20

59

23

44

REMARKS: The times are the hours since midnight. For instance, 7 means 7 am, and 13 means 1 pm.

The temperature is low in the morning, reaches a peak in the afternoon, and then decreases.

Tasks for Quadratic Regression Model (QR)

(QR-1) Plot the points (x, y) to obtain a scatterplot. Note that the trend is definitely non-linear. Use an appropriate scale on the horizontal and vertical axes and be sure to label carefully.

(QR-2) Find the quadratic polynomial of best fit and graph it on the scatterplot. State the formula for the quadratic polynomial.

(QR-3) Find and state the value of r2, the coefficient of determination. Discuss your findings. (r2 is calculated using a different formula than for linear regression. However, just as in the linear case, the closer r2 is to 1, the better the fit. Just work with r2, not r.) Is a parabola a good curve to fit to this data?

(QR-4) My "n" is 23. Use the quadratic polynomial to make an outdoor temperature estimate. Each class member will compute a temperature estimate for a different time of day. Look at the Class Members list, and look for the number "n" next to your name. Take your number n, multiply it by 0.5 and add to 6 to get a time x in hours; that is, compute x = 0.5n + 6. The value of x is the time you will substitute into the quadratic polynomial to make a temperature estimate. For instance, if your n is 15, then x = 0.5(15) + 6 = 13.5 hours (1:30 pm).

(QR-5) Using algebraic techniques we have learned, find the maximum temperature predicted by the quadratic model and find the time when it occurred. Report the time to the nearest quarter hour (i.e., __:00 or __:15 or __:30 or __:45). (For instance, a time of 18.25 hours is reported as 6:15 pm.) Report the maximum temperature to the nearest tenth of a degree. Show work.

Exponential Regression (ER)

Data: A cup of hot coffee was placed in a room maintained at a constant temperature of 69 degrees.

The temperature of the coffee was recorded periodically, and the following table was compiled.

Table 1:

Time Elapsed (minutes)

Coffee Temperature (degrees F.)

x

T

0

166.0

10

140.5

20

125.2

30

110.3

40

104.5

50

98.4

60

93.9

REMARKS: Common sense tells us that the coffee will be cooling off and its temperature will decrease and approach the ambient temperature of the room, 69 degrees.

So, the temperature difference between the coffee temperature and the room temperature will decrease to 0.

We will be fitting the data to an exponential curve of the form y = A e- bx. Notice that as x gets large, y will get closer and closer to 0, which is what the temperature difference will do.

So, we want to analyze the data where x = time elapsed and y = T - 69, the temperature difference between the coffee temperature and the room temperature.

Table 2

Time Elapsed (minutes)

Temperature Difference (degrees F.)

x

y

0

97.0

10

71.5

20

56.2

30

41.3

40

35.5

50

29.4

60

24.9

Tasks for Exponential Regression Model (ER)

(ER-1) Plot the points (x, y) in the second table (Table 2) to obtain a scatterplot. Note that the trend is definitely non-linear. Use an appropriate scale on the horizontal and vertical axes and be sure to label carefully.

(ER-2) Find the exponential function of best fit and graph it on the scatterplot. State the formula for the exponential function. It should have the form y = A e- bx where software has provided you with the numerical values for A and b.

(ER-3) Find and state the value of r2, the coefficient of determination. Discuss your findings.(r2 is calculated using a different formula than for linear regression. However, just as in the linear case, the closer r2 is to 1, the better the fit.) Is an exponential curve a good curve to fit to this data?

(ER-4) My "n" is 23 - Use the exponential function to make a coffee temperature estimate. Each class member will compute a temperature estimate for a different elapsed time. Look at the Class Members list, and look for the number "n" next to your name. Take your number n, multiply it by 6 to get an elapsed time x; that is, compute x = 6n. The value of x is the time (in minutes) you will substitute into the exponential function to make a temperature estimate. For instance, if your n is 14, then x = 6(14) = 84 minutes, and then you would substitute x = 84 minutes into your exponential function to get y, the corresponding temperature difference between the coffee temperature and the room temperature.

(ER-5) My "n" is 23. Use the exponential function together with algebra to estimate the elapsed time when the coffee arrived at a particular target temperature. Report the time to the nearest tenth of a minute. Each class member will work with a different target temperature. Look at the Class Members list, and look for the number "n" next to your name. Take your "n" value and add it to 69 to get your target temperature T. For instance, if your n is 14, then your target temperature T is 69 + 14 = 83 degrees, and your goal is to find out how long it took the coffee to cool to 83 degrees.

Given your target temperature T, then y = T - 69 is your target temperature difference between the coffee and room temperatures. Use your exponential model y = A e-bx. Substitute your target temperature difference for y and solve the equation y = A e-bx for elapsed time x. Show algebraic work in solving your equation. State your results clearly -- your target temperature and the estimated elapsed time, to the nearest tenth of a minute.

For instance, if the target coffee temperature T = 150 degrees, then y = 150 - 69 = 81 degrees is the temperature difference between the coffee and the room, what we are calling y. So, for this particular target coffee temperature of 150 degrees, the goal is finding how long it took for the temperature difference y to arrive at 81 degrees; that is, solving the equation 81 = A e- bx for x.

NOTES: Submit all of your project in one document or a combination of documents, which may consist of word processing documents or spreadsheets or scanned handwritten work, provided it is clearly labeled where each completed task can be found. Projects are graded on the basis of completeness, correctness, ease in locating all of the items, and overall strength of the presentation.

Reference no: EM131303489

Questions Cloud

How were the studies conducted : How do other, traditional distractions compare to cell phone use in their effects on driving (such as eating, attending to children, talking to passengers, listening to music/news, etc.)?Can cell phone use while driving be compared with drunk driv..
What is the cross-rate of euros to swiss francs : Suppose the exchange rate between U.S. dollars and Swiss francs is SF 1.208 = $1.00, and the exchange rate between the U.S. dollar and the euro is $1.00 = 1.0271 euros. What is the cross-rate of euros to Swiss francs (Euro/SF)?
What is the value of this company : Answer the following questions: What is the value of this company using the Fundamental Method of valuation?  For $3.0 million investment, what portion of the company should be given up
Binomial model-find the price of call option on the stock : Binomial Model The current price of a stock is $18. In 1 year, the price will be either $27 or $16. The annual risk-free rate is 3%. Find the price of a call option on the stock that has a strike price is of $23 and that expires in 1 year.
Find the exponential function of best fit : Find the exponential function of best fit and graph it on the scatterplot. State the formula for the exponential function. It should have the form y = A e- bx where software has provided you with the numerical values for A and b.
Capm-required return-calculate the required rate of retun : CAPM and required return Calculate the required rate of return for Mudd Enterprises assuming that investors expect a 4.5% rate of inflation in the future. The real risk-free rate is 1.75%, and the market risk premium is 6%. Mudd has a beta of 1.2, an..
What can be done to shorten the cash conversion cycle : What can be done to shorten the cash conversion cycle? What is the benefit to the Firm from doing so? What is Internal Rate of Return? What is it used for? Why
Expect return on equity to be constant rate : Suppose investors in Proctor and Gamble have a 7% cost of equity. Based on Analysts’ forecasts you expect Proctor and Gamble to have earnings per share of $3.80 in one year and earnings per share of $4.20 in two years. After two years you expect retu..
Calculate the outcome of this hedge in the us dollar : If your company chooses to hedge this exposure in the forward market, calculate the outcome of this hedge in the US dollar. If your company chooses to hedge this exposure in the forward market, the outcome of this hedge in the US dollar is certain (..

Reviews

Write a Review

Applied Statistics Questions & Answers

  Characteristics on patients participating in clinical trial

Characteristics on patients participating in a clinical trial.

  Determine the impact of social media use on student learning

Research paper examines determine the impact of social media use on student learning.

  Obtain the difference in the mortality rates

Run the Wilcoxon rank-sum test to show whether there is a statistically significant difference between the mortality rates of children under the age of five years of the regions

  Quantitative business analysis

Quantitative Business Analysis - Find Correlation, simple linear, and Multiple Regression Analysis

  How to solve statistics for business and economics

Can you please show me step by step how to solve Statistics for Business and Economics, 12 edition, Case Studies: Air Force Training Program (pg. 503-504) and Wentworth Medical Center (pg. 591-592)?

  Does xn have a limiting distribution

Let X1, X2, ..., Xn be a random sample from from CDF Fn(x) = (1 + 1/nx)-n for x > 0 and zero otherwise. Does Xn have a limiting distribution?

  Q1in the work represented in the image below describe how

q1.in the work represented in the image below describe how each of the following manifest if at alla.nbsp awkward

  Compare mean number of dealers visited by early replacement

Use the confidence intervals you computed in parts a and b to compare the mean number of dealers visited by early replacement buyers with the mean number of dealers visited by late replacement buyers.

  Which variable is the independent variable

You are consulting for a large real estate firm.  You have been asked to construct a model that can predict listing prices based on square footages for homes in the city you've been researching.  You have data on square footages and listing prices fo..

  Strategic placement of lobster traps is one of the keys for

Strategic placement of lobster traps is one of the keys for a successful lobster fisherman. An observational study of teams fishing for the red spiny lobster in Baja California Sur, Mexico, was conducted and the results published in Bulletin of Marin..

  Selected from an underlying normal distribution

In a sample of n = 15 selected from an underlying normal distribution, we obtain standard deviation s =10. Test the null hypothesis that the population standard deviation σ = 16.

  Quantify the uncertainty of your estimate

Bob's, a fast-food chain specializing in hot dogs and garlic fries, keeps track of the proportion of its customers who decide to eat in the restaurant (as opposed to ordering the food "to go") so it can make decisions regarding the possible construct..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd