Find the exact solution to the initial value problem

Assignment Help Engineering Mathematics
Reference no: EM13297137

Given that dy/dt = y + et with y(0) = 0.

i) Apply Euler's Method to find ya (1) using step size h = 0.1;

ii) Apply Improved Euler's Method to find yb (1) using step size h = 0.1;

iii) Find the exact solution to the initial value problem;

iv) Estimate the errors in the predicted value of ya(1) and yb (1) and suggest a value of step size for each method that would provide a value of y(1) accurate to 0.5%.

Reference no: EM13297137

Questions Cloud

Calculate the density of the fluid : A 3.40-kg aluminum ball has an apparent mass of 2.10 kg when submerged in a particular liquid. Calculate the density of the fluid
What would be the value of this bond : What would be the value of this bond if interest rates fall to 5% seven days after it is purchased? If interest rates fell to 5% after two year, what would the bond be worth at that point?
Compute the voltage between the surface and the axis : Compute the voltage between the surface and the axis of a uniformly charged infinite cylinder of radius a
At what tax rate would an investor be indifferent : Corporate bonds issued by Johnson Corporation currently yield 11%. Municipal bonds of equal risk currently yield 6.5%. At what tax rate would an investor be indifferent between these two bonds? Round your answer to two decimal places. %
Find the exact solution to the initial value problem : Find the exact solution to the initial value problem and estimate the errors in the predicted value of ya(1) and yb (1) and suggest a value of step size for each method that would provide a value of y(1) accurate to 0.5%.
Find the electric field intensity vector at arbitrary point : A charge of density p is distributed uniformly along an arc representing a half of a cirle of radius r. Determine the electric field intensity vector at an arbitrary point
One could buy a theater ticket for : In 1974, one could buy a theater ticket for $1.25. Today, the same theater ticket costs $6.50. Which pair of CPI's would imply that the cost in today's dollars was the same for both tickets? a. 60 in 1964 and 390 today. b. 75 in 1964 and 390 today. c..
Determine maximum normal stress in each of links be and cf : Rigid members ABC and DEF are joined with steel links BE and CF using 25mm pins. The links are made of 25mm thick 50mm wide plates and are single shear. Determine the maximum normal stress in each of links BE and CF
Compute the total charge of the cube : A cube of edge length a in free sapace is charged over its volume with a charge density p(x)=p0 *sin(pi*x/a), Compute the total charge of the cube

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Prime number theorem

Dirichlet series

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

  Find the probability density function

Find the probability density function.

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Discrete-time model for an economy

Discrete-time model for an economy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd