Find the distance traveled before the particle comes to rest

Assignment Help Civil Engineering
Reference no: EM13318988

the velocity of a particle is given by the relation v=100-10x, where v is expressed in meters per second and x in meters. Knowing that x=0 at t=0, determine (a) the distance traveled before the particle comes to rest, (b) the time t when x=5m, (c) the acceleration at t =0.

Reference no: EM13318988

Questions Cloud

Explain what is the molar mass of the unknown gas : What is the molar mass of the unknown gas. Elemental analysis of the unknown gas from Part A revealed that it is 30.45% N and 69.55% O. What is the molecular formula for this gas.
Compute the design compressive strength for lrfd : A w14X74 of A992 Steel has a length of 20 feet and fixed ends. Compute the design compressive strength for LRFD and the allowable compressive strength for ASD.
What is its height of the tower on a hot day : An iron tower in is 372 meters tall on a cold day (T = -7.1 degrees Celsius). What is its height of the tower on a hot day
Determine the largest distance x that the stream can reach : A nozzle discharges a stream of water with an initial velocity v0 of 50 ft/s into the end of a horizontal pipe of inside diameter d=5ft. determine the largest distance x that the stream can reach.
Find the distance traveled before the particle comes to rest : the velocity of a particle is given by the relation v=100-10x, where v is expressed in meters per second and x in meters. Knowing that x=0 at t=0, determine (a) the distance traveled before the particle comes to rest
Compute the bullets temperature change in degrees celsius : A 0.031 kg aluminum bullet traveling at 471 m/s strikes an armor plate and comes to a stop. compute the bullet's temperature change in degrees Celsius
Evaluate the molarity of the sodium hydroxide solution : The student then titrates the oxalic acid solution with her sodium hydroxide solution. When the titration reaches the equivalence point, the student finds she has used 0.1265 L of sodium hydroxide solution. Calculate the molarity of the student's ..
Find the cross sectional area of the specimen after loading : A rectangular copper specimen (Table 1--> E=120GPa) is loaded in tension of 300MPa and then the load is removed. The total plastic strain in the unloaded specimen is e=0.25.
What is the batterys internal resistance : A battery with an emf of 12.0 V shows a terminal voltage of 11.3V, What is the battery's internal resistance

Reviews

Write a Review

Civil Engineering Questions & Answers

  Discuss types of earth moving used in field of engineering

Find the swell for a soil which weighs 1600kg/m in bank and 1300kg/m3 in bank and 1300kg/m3 Loose and what is the shrinkage factor for a mass of soil that takes up 1.5m3 in bank and reduces down to 1.2m3 after compaction

  What value for fy are two forces perpendicular to each other

what value for Fy are the two forces F1=4i+Fyj+20K(N) and F2=8i-5j+7k(N) perpendicular to each other

  What is the elongation of the brass rod due to the load

A hollow circular, gray cast-iron pipe supports a red brass rod and weight W = 2 kips, as shown. The outside diameter of the pipe is d = 6". If the allowable compressive stress in the pipe is 5000 psi and the allowable shortening of the pipe is 0...

  Find maximum thickness t of the strip at allowable stress

A 900-mm strip of steel is bent into a full circle by two couples applied. Determine (a) the maximum thickness t of the strip if the allowable stress of the steel is 420 MPa, (b) the corresponding moment M of the couples.

  What measurements should be laid out to establish a distance

a tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. what measurements should be laid out to establish a horizontal distance of 682.25ft

  Total vehicle delay in the cycle with queueing diagram

If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .

  Determine the spiral curve length to satisfy all requirement

A horizontal curve on a two-lane highway is designed with a 818.51ft radius, 12ft lane, superelevation 6.4%, and a 50mph design speed. Deflection angle is 90 degree. The maximum relative gradient is 0.50.

  Compute the new thickness of sand over extra strata

A 1.20-m thick strata of sand has a void ratio of 1.81. A contractor passes a vibratory roller over this extra strata, which densifies it and reduces its void ratio to 1.23. Compute its new thickness.

  How many units must the company sell each year to breakeven

the cost and revenue associated with producing a sustainable component are fixed costs = $112,500. Variable costs = $30 / unit. Revenue = $45 / unit. How many units must the company sell each year to breakeven

  What is the maximum column load in kips on a sand

What is the maximum column load in kips that could be placed on a 4-ft square temporary footing on a sand for which the standard resistance is about N=15 and the water table is at the surface

  Vehicle delay due to queuing

Vehicles begin to arrive at a toll booth at 850 am with an arrival rate of x(t) = 4.1 + .01t (with t in min and x(t) in veh /min.) The toll booth opens at 9am and processes vehicles at a rate of 12 per minute throughout the day. Assuming D/D/1 que..

  Find the diamensions b and a with balanced stress

A reinforced concrete beam d = 18 in , and n = 10. find the diamensions b and a , that will resist a bending movement of 60 kip,ft with balanced stress reinforcement if fc =1600 psi and fs = 20 ksi

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd