an embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit. the water contenet of the sandy soil in the borrow pit is 15%& its void ratio is 0.69.The specification requires the embankment be compacted to a dry unit weight of 18KN/m3.Determine for 1KM length of embankment,the following:

a.the weight of sandy soil from the borrow pit required to construct the embankment
b.the number of 10.0m3 truckloads of sandy soil required for the construction
c.the weight of water per truck load of sandy soil
d.the degree of saturation of the sandy soil in situ

Reference no: EM13211106

Questions Cloud

Write computer code using matlab that emoloyes the nelder : write computer code using Matlab that emoloyes the nelder and mead simplex method to solve the welded-beam design (benchmark problem
What is the mass of the fish : A fish hanging from the bottom of the spring oscillates vertically at a frequency of 2.00 Hz. Ignoring the mass of the spring, what is the mass of the fish?
Inability and green engineering can be integrated : inability and green engineering can be integrated in the four components of materials science and engineering?
What is the purpose of a cost allocation system : Compare the profits and accuracy of all cost allocation schemes based on Tom Arnold's initial reason for being hired and what is the purpose of a cost allocation system?
Find the degree of saturation of the sandy soil in situ : an embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit.
State the gas is at standard temperature and pressure : Assuming that the gas is at standard temperature and pressure there is 1.00 mole per 22.4 L of volume how many argon atoms are there present in this sign
Determine the horizontal reaction : Determine the horizontal reaction that is developed on the gate at C.
Determine how long the train blocked the crossing : A train 552 m long is moving on a straight track with a speed of 88.5 km/h. The engineer applies the brakes at a crossing, and later the last car passes the crossing with a speed of 13.7 km/h.
State combusted in an oxygen rich environment to produce : The compound known as butylated hydoxytoluene, abbreviated as BHT, contains carbon, hydrogen, and oxygen. A 1.376 g sample of BHT was combusted in an oxygen rich environment to produce

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd