A manufacturing firm is considering two locations for a plant to produce a new product. The two locations have fixed and variable costs as follows: Atlanta: fixed costs (annual)= 80000, vairable costs (per unit)=20 Phoenix: fixed costs= 140000, variable costs = 16 1. At what annual output would the company be indifferent between the two locations? 10,000 units 20,000 units 4,000 units 15,000 units 60,000 units 2. What would the total annual costs be for the Phoenix location with an annual output of 10,000 units? $140,000 $220,000 $280,000 $300,000 $156,000 3. What would be the total annual costs at the point of indifference? $300,000 $760,000 $240,000 $380,000 $220,000 4. If annual demand is estimated to be 20,000 units, which location should the company select? either Atlanta or Phoenix reject both Atlanta and Phoenix Phoenix Atlanta build at both locations 5. If the annual demand will be 20,000 units, what would be the cost advantage of the better location? $60,000 $460,000 $20,000 $480,000 $80,000

Reference no: EM13103807

Questions Cloud

What is the direction of the force that the unknown charge : What is the direction of the force that the unknown charge exerts on the charge of magnitude 0.580uC?
Expected number of people in american household : It's estimated that 57% of Americans live in households with 1 or 2 people, 32% live in households with 3 or 4 people and 11% live in households with 5 or more.
What is the z score for a person : What is the Z score for a person who watches more than 8 hours per day?
How many electrons would have to be removed : How many electrons would have to be removed from one sphere and added to the other to cause an attractive force between the spheres of magnitude 1.00 x 10^4 N (roughly one ton)? Assume that the spheres may be treated as point charges.
Find the cost advantage of better location : A manufacturing firm is considering two locations for a plant to produce a new product. The two locations have fixed and variable costs as follows: Atlanta: fixed costs (annual)= 80000.
How fast and in what direction with respect to the billboard : A rectangular billboard in space has the dimensions 10 meters by 20 meters. How fast and in what direction with respect to the billboard would a space traveler have to pass for the billboard to appear square?
Targeting a score on an exam : A professor is targeting a score of 80 on an exam. His forty-nine students averaged 78 on an exam with s = 7. Are the scores significantly less than 80 at a significance level of 0.05? Show your work and state the conclusion.
At what time does the ball reach its high point : A ball is thrown with an initial velocity of 14m/s. using the approximate value g=10 m/s^2, at what time does the ball reach its high point?
Develop the project initiation document : Develop the Project Initiation Document and complete the remaining sections of the Project Initiation Document template including the executive summary.

Reviews

Write a Review

Operation Management Questions & Answers

  Describe some of the best practices that leading companies

Has any aspect of the different levels approach been negative to the customer, or to the organization? Describe some of the best practices that leading companies using unique approaches to customer service have embraced.

  Which faces a greater need for global standardization

Discuss pressures for local responsiveness also global integration faced by each firm. Which experiences greater pull toward local responsiveness. Explain why. Which faces a greater need for global standardization.

  Illustrate what is its final kinetic energy

A proton is initially at rest at a point where potential is 501 V. Sometime later proton is at a point where potential is 218 V. If no force or than electrostatic force acts on proton, illustrate what is its final kinetic energy.

  Indicates that at least two of the projects must be done

Let x1, x2, also x3 be 0 - 1 variable whose values indicate whether the projects are not done (0) or are done (1). Which answer below indicates that at least two of the projects must be done.

  What is the relative wage rate of operating zooland

What is the "relative" wage rate (in $) of operating Zooland, after taking productivity differences into account?

  You plan to partner with two major food stores in the area

company will offer staples and frozen foods in a large metropolitan area and then deliver them within a customer-defined window of time. You plan to partner with two major food stores in the area

  A new aircraft control system is being designed

A new aircraft control system is being designed that must be 97.5% reliable. This system consists of four components in series.

  Compare and contrast the different kinds of costs

Compare and contrast the different kinds of costs in carrying inventory and what role the inventory turnover ratio has in determining those costs. Then think about a product(s)

  What is a balanced scorecard graphic

What is a balanced scorecard graphic. Design a balance scorecard and give an explanation

  Discuss the best way to link your job performance

discuss the best way to link your job performance to training strategies. Provide specific examples to support your response.

  Justify how you would generate change

Justify how you would generate change and articulate a vision of change within a particular organization of your choosing. Conceive a rationale for the beginning of a change initiative for this company.

  How might a universal health insurance program change

How might a universal health insurance program change the current trends in the health care industry?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd