Find rough cost estimate of the construction

Assignment Help Civil Engineering
Reference no: EM132637374

Kindly provide the detailed Solutions of the Case Given Below...its type of a quantity survey..

Qustiion no 1:

Part(a):

Your father wants to construct a one Kanal house, but he is uncertain of upcoming expenditures. As a quantity engineer, recently you have created many cost analyses of various civil engineering projects and know about the type of activities and their resulting expense. How would you give a rough and detailed cost estimate of the house? Which information would you use for the detail and rough cost estimate of the construction?

Part (b):

Edhi foundation wants to construct three shelter homes in Multan, Lahore, and Islamabad. The organization bought plots of similar size and dimensions and intended to build identical multi-story buildings. All these projects went through the bidding process in their respective cities. The Edhi organization was surprised by the difference in the lowest amount of bid for the same projects in highlighted cities. As a quantity engineer, how would you justify the cost difference? Support your answers with factual data

Part(c):

(i)Your company signed an agreement to construct a project for the local government. The contract was challenged in the court due to the lack of compliance with the essential requirements of the agreement. Your boss is concerned and wants you to locate all the possible reasons that can cause the cancelation of the contract.

(ii) Why some of the projects are constructed based on Lump Sum and others based on the cost-plus method of payment.

Part(d):

Instead of open tender, your firm wants to peruse the bidding process based on the closed tender. In your opinion, what could be the reasons for this change in strategy? How would your company implement this strategy for the selection of a qualified contractor?

Reference no: EM132637374

Questions Cloud

Determine the cost recovery deduction : On October 10, she purchased business computers for $160,000. Determine the cost recovery deduction for the business assets for 2018
Explain the changes in flow depth : Explain the changes in flow depth when a subcritical flow flows over a smooth hump. Provide theoretical explanation
How much budgeted cash disbursements on purchases of july : Kayapa purchases merchandise for resale to meet the current month. How much is the budgeted cash disbursements on purchases of Kayapa for July?
What is the account that links the income statement : When companies do not generate profits during the year, what is the account that links the income statement with the balance sheet
Find rough cost estimate of the construction : Your father wants to construct a one Kanal house, but he is uncertain of upcoming expenditures. As a quantity engineer
Compute the pressure : Compute the pressure at 2 if the liquid flowing is water
Cloud- industry certification benefit : How might the CompTIA Cloud+ industry certification benefit you and help you reach your goals? ow do you think employers view certifications?like?this one?
Government-global economy : Today's Global Economy is very top-down driven with the government making all the decisions and regulations as it relates to doing business globally
Find the minimum fracture toughness : Find the minimum fracture toughness (KIC) necessary to prevent the occurrence of fracture. Assume that the parameter Y has a value of 1.0.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine max grade on which passenger car a can travel

Determine the maximum grade on which passenger car A can travel without its total resistance exceeding that of car B traveling on a straight and level section of road.

  Evaluation of design commercial and environmental risk

The first part considers the use of computer modelling. The second part concentrates on the evaluation of design, commercial and environmental risk

  Name two methods that can be used in analysis of structures

Name two methods that can be used in analysis of structures.

  Determine the mass fraction of each component

A gas mixture consists of 5 kg of O2, 8 kg of N2, and 10 kg of CO2.

  Provide your code for completing curve fitting

Plot ω vs t, marked by red stars. Label the x-axis, t,and the y-axis, ω. Give the plot a suitable title. Add a legend to the plot describingthe relationship between ω and t. Change the y-axis scale to show the plotfrom estimate ω is -100 to 1100.

  Determine the depth of a french drain saturated depth

Determine the depth of a French drain (saturated depth) if the width is 3.0 feet, the effective permeability of the aggregate is 2000 ft/day, and the rate of discharge for 100 feet of trench is 1000 feet^3/day. The trench slope along the flow line is..

  Probelm relating to fire a bullet

A bullet is fired from a height of 150m at a velocity of 300kmph at an angle of 35 upward. Neglecting air resistance. Find: a) total time of flight b) horizontal range

  Provide values for shear and moment at nodes a and b

The system is made up of a contilever beam connected by pin at C to simply support the beam. Draw a shear / moment diagram. Provide values for shear and moment at nodes A,B,C,D,E, and F.

  What is the probability that a problem vehicle will lead

Traffic signals were installed at an intersection involving two one-way streets. Suppose 75% of the vehicles will decelerate when they see the amber light, whereas 20% will accelerate and 5% are "indecisive" and simply continue with the same speed..

  Compute the seepage velocity

Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.

  Calculate head supplied by the pump for the system

Water from a lower reservoir (water surface elevation) 500 m is pumping to the upper reservoir (water surface elevation 600 m) through a 5000 m long straight pipe with 0.5 m diameter.

  What is the mean momentum flow rate down the pipe

laminar flow of a real fluid down a cylindrical pipe of constant radius R. Poiseuille showed that the velocity profile was parabolic and given by u(r)=c(R^2-r^2), where r is the radial coordinate and c is a dimensional constant.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd