Find relevant information to complete design successfully

Assignment Help Civil Engineering
Reference no: EM132314029

Application of timber in Engineering Structures - Design Assignment

Assignment Details - This assignment covers the main design competencies required for undertaking a commercial timber building design project. To complete the assignment, students are expected to put considerable amount of work including research to find relevant information to complete the design successfully.

What is required?

You are required to undertake the detail structural design of a 40m x 24m office building (2 storey) located in Sydney (Wind Terrain Category 3). Details of the required building plan and elevation is given in the attached drawing. The structural importance of the building is classified as normal. The design brief will require you to prepare options for each design stage and make recommendation on the preferred option.

You must design the building to conform to AS/NZS 1170 for gravity and wind loads, to meet SLS and ULS criteria. Since the wind loads are more critical than seismic, you are not required to design for earthquake events.

The available material is generally classified as (i) Grade 11 pine LVL, either 45mm or 63 mm thick - sourced from Australia or New Zealand and (ii) 3, 5 or 7 layered CLT panel options are available from XLam New Zealand.

You may assume that the foundations and basement masonry walls / retaining walls will be designed by others. The structural system for the building is essentially post and beam and / or portal construction with appropriate lateral bracing. All other walls are non-load bearing and as such, you do not need to design the infill walls.

You must design each of the design alternatives/options and make decision on your final choice/recommendation before moving to the next step.

Flooring - 2 options required (both simply supported single span):

  • Floors must be designed to resist an imposed load of 3 kPa distributed loads, in conjunction with a 3.5 kN concentrated load.
  • Option 1 - a Timber composite floor spanning up to 8 m.
  • Option 2 - a CLT floor spanning up to 8 m.
  • All floor options must be designed for a deflection limitation of span / 300 for a short term SLS load of 0.7 Q.
  • Design suitable floor support beams (spanning between columns / portal frames) to support the main floor.
  • Provide specification / details for acoustic / fire separation to meet a 60 minutes FRL fire rating.

Framing - 2 options required:

  • Option 1 - floor beams, columns and bolted roof trusses. You only need to design the standard truss- do not worry about the corner ridges.
  • Option 2 - a gable portal frame (with floor beams as required) over the entire building. Whilst the architectural drawing gives guidance on the roof pitch, variation to it is acceptable as long as the roof height is not exceeded. You also have the flexibility to decide on the column / frame spacing.
  • Design suitable lateral bracing in both directions to resist horizontal wind loads.

Connections:

  • Design connections for both framing options, noting the portal connections must be moment resisting and the truss connections must be bolted.
  • Design all floor to beam and beam to column connections.

Submit a soft copy of the following -

A professional design report that includes:

  • An executive summary
  • Summary of all design assumptions, including loads
  • A summary table indicating the selected member sizes for each major structural element, including connections
  • Detailed calculations for all members and connection presented in an appendix

CAD drawings - Should be drawn to scale and show preliminary design details for the structural elements of floor, wall and roof framing, bracing and connections.

Specification Sheet - A specification sheet should accompany the drawings and present any specific design assumption that a builder would need to know in order to construct the building.

Note - Need only report for flooring part which is in assignment brief which attached. Need calculations all in excel sheets attached separately? Need calculation for two separate flooring options that is lvl and clt and choosing best among them design of suitable floor support beams and there calculations to support main floor vibration check and provide detail for acoustic and fire separation to meet 60 minutes of frl fire rating.

Attachment:- Assignment Files.rar

Reference no: EM132314029

Questions Cloud

Change management in the project management processes : Discuss the need for change management in the project management processes. How can the application of change management principles impact project as a whole?
Define the five conflict management styles : List and explain the three parts of the message-receiving process. Define the five conflict management styles. Discuss the main criticisms of LMX Theory.
Becoming a professional early childhood teacher : EC501 - Becoming a professional Early Childhood Teacher - New Zealand Tertiary College - Prepare a paper on Becoming a professional Early Childhood Teacher
Aligned with either monochronic or polychronic time systems : Which events are more clearly aligned with either monochronic or polychronic time systems? How does your personal view on time systems impact time management.
Find relevant information to complete design successfully : University of Technology Sydney - 49136 Application of timber in Engineering Structures - Design Assignment. Find information to complete design successfully
Evaluate the cost-effectiveness of a hypothetical health : Evaluate the cost-effectiveness of a hypothetical health promotion intervention using a spreadsheet-based Markov cohort model.
Prepare an annotated bibliography : Conduct a literature review and prepare an annotated bibliography of at least 150 words for each of the five resources you'll use to complete this assignment.
Articles on optimization and demand analysis techniques : Read three (3) academically reviewed articles on optimization and demand analysis techniques. Discuss at least 3 different concepts presented in the articles.
Business fundamentals : Imagine you are thinking of starting a restaurant in your community. What are the most critical two to three challenges you believe you would face?

Reviews

len2314029

5/30/2019 2:58:42 AM

I need to make clear that i need only report for flooring part which is in assignment brief which I have attached I need calculations all in excel sheets attached separately I need calculation for two separate flooring options that is lvl and clt and choosing best among them design of suitable floor support beams and there calculations to support main floor vibration check and provide detail for acoustic and fire separation to meet 60 minutes of frl fire rating and when I get report I need all excel sheet separately attached thank you waiting for reply as early as possible waiting for your response.

len2314029

5/30/2019 2:58:36 AM

This is a group assignment. However, each student is required to contribute to every part of the assignment. Each group must maintain a spread sheet/journal to record time and work completed and a group feedback survey will be conducted at the time of final report submission. If evidence that one or more students have not contributed to the team effort is found, the students who do not contribute will be penalised and receive a proportionally lower mark or in the worst case, will get ‘0’ mark for the assignment. Students will be allocated to working groups of 5 or 6 students on a random basis. Group list will be uploaded to UTS_Online. The assignment must be submitted by the due date. Late submissions will attract mark deductions.

len2314029

5/30/2019 2:58:31 AM

All the submissions should submitted by uploading it on UTS_Online before the due date. Each group can nominate one member to upload the soft copies. The report should be compiled into a single file (word or pdf version) and supporting documents e.g. appendices, worked examples, etc can be submitted as separate file. No hard copy submission is required. Note: There is no “single” correct solution to this design exercise. However, your solution must be safe, meet the functional and serviceability requirements and be economical. Marks will be awarded on the basis of meeting these 3 criteria.

Write a Review

Civil Engineering Questions & Answers

  How to locate the buried castle ruins in middle of farmland

You have been hired to do a survey to search for old tunnels that are rumored to be in the area, previously used to smuggle people across the US-Mexico border. The tunnels are not expected to be exceptionally deep underground.

  What is the total lenth ac and its standard deviation

A line AC was observed in 2 sections AB and BC, with lengthsand standard deviations listed below. What is the total lenth AC and its standard deviation?

  Plot the exit temperature against the percent excess air

Methane gas (CH4) at 25°C is burned with the stoichiometric amount of air at 25°C during an adiabatic steady-flow combustion process at 1 atm. Assuming the product gases consist of CO2, H2O, CO, N2, and O2,

  Determine the magnitude r of the downward force

The guy wires AB and AC are attached to the top of the transmission tower. The tension in cable AB is 8.6 kN. Determine the required tension T in cable AC such that the net effect of the two cables is a downward force at point A.

  What are the measures adopted to enhance sufficient

what are the measures adopted to enhance sufficient resistance of the superstructure during the launching process?

  How long would it take for the sled to reach at end of track

In 2003 at Holloman Air Force Base in New Mexico, test engineers set a world record by moving 192 lb payload at 6,453 miles per hour in a rocket sled. The rocket sled track, built in 1954, is 15.44 km in length.

  Determine the resultant in magnitude

The four coplanar forces are acting at a point as shown in the diagram. Determine the resultant in magnitude and direction analytically and graphically.

  Why is thinning occurring in the walls of the cup

What changes could be made in the operation to correct the problem?

  Solve given differential equation by separation of variables

Given computer-generated direction field. Then sketch, by hand, an approximate solution curve that passes through each of the indicated points. Use different colored pencils for each solution curve.

  Report on separate eligible bachelors

Calculate the numbers of married men, single men, married women and single women. Print these numbers on a student summary report. If any single men are over 30 years of age, print their names and ages on a separate eligible bachelors report.

  How many holes are required to break 250000 tons

Conduct a powder factor design for the following conditions: -Rock is iron ore; density is 5370 lb/cubic yards -Rock swells 60% from in situ when broken -Bench height is 45ft -Drill hole diameter is 12.25 inches

  How much volume of naoh solution is needed at poh at 9

A NaOH solution has pOH at 8. How much volume of this NaOH solution is needed to prepare 1 L of a NaOH solution at pOH at 9.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd