Reference no: EM132514172
The management of Firebolt Industries Inc. manufactures gasoline and diesel engines through two production departments, Fabrication and Assembly. Management needs accurate product cost information in order to guide product strategy. Presently, the company uses a single plantwide factory overhead rate for allocating factory overhead to the two products. However, management is considering the multiple production department factory overhead rate method. The following factory overhead was budgeted for Firebolt:
1 Fabrication Department factory overhead $561,600.00
2 Assembly Department factory overhead 241,500.00
3 Total $803,100.00
Direct labor hours were estimated as follows:
Fabrication Department4,800hours
Assembly Department5,250
Total10,050hours
In addition, the direct labor hours (dlh) used to produce a unit of each product in each department were determined from engineering records, as follows:
Production Departments Gasoline Engine
Diesel Engine Fabrication
Department3.1 dlh1.8 dlh
Assembly Department1.83.1
Direct labor hours per unit4.9 dlh4.9 dlh
Question 1: Determine the per-unit factory overhead allocated to the gasoline and diesel engines under the single plantwide factory overhead rate method, using direct labor hours as the activity base . If required, round all per-direct labor hours and per-unit answers to the nearest cent.