An undisturbed soil sample was collected in a sampling tube of internal diameter 5cm. The length of the extracted sample was 10.2 cm and its mass was 360 g. After oven drying the mass reduced to 326.5 g. The specific gravity was determined to be 2.70. Find the following:
a) Dry unit weight of the sample
b) Water content
c) Void ratio
d) Degree of saturation
e) Mass of water to be added to the sample to reach full saturation

Reference no: EM13296554

Questions Cloud

What is valence share price : If Valence's earnings are expected to grow by 6% per year, these payout rates do not change, and Valence's equity cost of capital is 8%, what is Valence's share price?
Calculate the drift speed of conduction electrons in wire : An iron wire has a cross-sectional area equal to 9.50 10-6 m2. Carry out the following steps to determine the drift speed of the conduction electrons in the wire if it carries a current of 8.0 A. Calculate the drift speed of conduction electrons in..
What is the equivalent cost of the new meter : It could be sold for $40 at the end of its life. The new meter costs $14 per year to operate and maintain. If the cost of capital is 12% then.
What is the value of the apple groves : Suppose prices increase at the inflation rate, but costs increase at half the inflation rate. What is the value of the apple groves?
Find dry unit weight of the sample and water content : An undisturbed soil sample was collected in a sampling tube of internal diameter 5cm. The length of the extracted sample was 10.2 cm and its mass was 360 g. After oven drying the mass reduced to 326.5 g.
What are differences between the types of book depreciation : What are the differences between the types of Book Depreciation.What is the impact of using the ½ year convention in the MARCS method of Tax depreciation?
What is the velocity of the fluid in the wide section : Water is flowing through a pipe with a constriction. The diameter of the narrow section is one-third the diameter of the wide section. what is the velocity of the fluid in the wide section
Calculate the amount of co produced in a rich combustion : Assume the only products are CO2, H2O, CO and N2. State results as the CO molar fraction of both wet and dry exhaust products ( wet exhaust products include H2) and dry exhaust products exclude it).
What is the holding period return : The price of a bond, par value $1000, at the beginning of a period is $990 and $985 at the end of the period. What is the holding period return if the annual coupon rate is 4.5%?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Draw all aldehyde and ketone isomers of c6h12o

What is the reaction that occurs with hexanal and propanol (give both the hemiacetal and acetal products)?

  Discuss about damp-proofing trenches

Discuss about damp-proofing trenches

  Define deflection of a beam

Deflection of a Beam, If a beam of lenght L is fixed at the ends and loaded in the centre of the beam by a point load of F newtons the deflection

  Environmental soil cleaning company

How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.

  Determine the compressive strengths of the following

Determine the compressive strengths of the following

  Calculate the maximum length

The elevation of the lowest bottom of the structure is at 1470 feet. Calculate the maximum length (feet) of the parabolic curve required to meet the given conditions.

  Find the direction of flow

A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively. The velocity head and pressure head at lower ends are 0.203 m and 5.407 m respectivel..

  Estimate the first derivative of f

Write a script newquot.m that uses the Newton quotient, [f (x + h) - f (x)]/h, to estimate the first derivative of f (x) = x3 at x = 1, using successively smaller values of h: 1, 10-1, 10-2, and so forth. Use a function M-file for f (x).

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  Horizontal motion of plunger and shaft

The horizontal motion of plunger and shaft is arrested by resistance of the attached disk which moves through the oil bath. If the velocity of plunger is v.

  Explain what criteria are used in the selection of personnel

What criteria are used in the selection of personnel for the demonstration of maintenance tasks? Define the criteria for the selection of test and support equipment.

  Length of contracted rectangular weir

A trapezoidal canal 6m wide at the bottom and having a side slope of 1V:2H carries water with a mean velocity of 1.0m/s to a depth of 60cm. What length of contracted rectangular weir 1.0m high should be placed at the middle of the canal to make th..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd