Reference no: EM132758355
Finalize Project Schedule and Mitigate Any Delays
Competency
Evaluate the concepts of work breakdown structure, coding, forecasting, and scheduling as project control functions.
Scenario Information
You are assuming the role of the project manager for a company called SuperPacks to provide a new backpack product with a built-in refrigeration pouch and radio module. Your customer for this project is the U.S. Army, Ground Forces and Special Operations. As the project manager for your team, you will be submitting to your manager a project management report.
Instructions
As the Project Manager, your manager has asked you to prepare a report on unplanned events that have occurred. You have been asked to present this report to a group of managers, and should discuss your course of action for two unplanned events (below) that have occurred for SuperPacks. You will need to analyze the impact of these events in your project management report as a presentation; this can be PowerPoint, Prezi, or any presentation tool. Make sure you address the following questions in your presentation as you will be giving it to the management team.
Discuss your analysis on the following events:
1. It is discovered the refrigerated module is too large for the designed refrigerated backpack pouch. What is your course of action?
2. The subcontractor assigned to build the radio module for the backpack has shut down. What is your course of action?
3. Discuss four areas affected by these unexpected events. Three of the areas of the project affected by the events should include changes to budget, human capital, and impact to schedule. Identify one additional area affected by these events.
Find the amount of money in the account
: Suppose we make a deposit into a savings account at the end of each quarter for ten years. Our first deposit is $1000 and each subsequent deposit will be.
|
What is gold company stock worth
: If the company is growing at a rate of 2.85 percent per year, and your required rate of return is 11.36 percent, what is Gold's company stock worth to you?
|
How much is the allocated cost to preference shares
: Quoted prices per share are P480 and P600 for ordinary and preference shares, respectively. How much is the allocated cost to preference shares
|
What is net present value of project given a required return
: Jasper Metals is considering installing a new molding machine which is expected to produce operating cash flows of $72,000 per year for 9 years.
|
Finalize project schedule and mitigate any delays
: Evaluate the concepts of work breakdown structure, coding, forecasting, and scheduling as project control functions.
|
Calculate the minimum number of jars of silver polish
: Juarez Corporation, Calculate the minimum number of jars of silver polish that would have to be sold to justify further processing of Grit 337.
|
What are the common earnings per share
: BTS Corporation has 200,000 shares of $5 par common stock issued and outstanding. What are the common earnings per share (EPS) for 2019
|
Calculate the payback period for the solar panels
: Discuss whether the company should consider the project or reject the project. Calculate the payback period for the solar panels.
|
Calculate pretax and? after-tax hpr on? jills investment
: Jill Clark invested $25,000 in the bonds of Industrial? Aromatics, Inc. She held them for 13? months, at the end of which she sold them for $26,832.
|