Fabricator Inc., a specialized equipment manufacturer, uses a job order costing system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $ 3,000 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following: Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $3,000. This means that while direct labor makes up only 5% of our total product cost, it drives all our costs. In addition, these rates give my design engineers incentives to "design out" direct labor by using machine technology.
Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $4,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30-minute error in our estimate of assembly time is worth $1,500. Small mistakes in our direct labor time estimates really swing our bids around. I think this puts us at a disadvantage when we are going after business. 1. What is the engineer's concern about the overhead rate going "up and up"? 2. What did the engineer mean about the large overhead rate being a disadvantage when placing bids and seeking new business? 3. What do you think is a possible solution?
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd