Reference no: EM13324833
Waste Management
City 1 produces 500 tons of waste per day, and city 2 produces 400 tons of waste per day. Waste must be incinerated at incinerator 1 or 2, and each incinerator can process up to 500 tons of waste per day. The cost to incinerate waste is $40/ton at incinerator 1 and $30/ton at incinerator 2. After incineration, the waste should be sent to a disposal landfill. The landfill will receive the 900 tons of incinerated waste per day (i.e., the waste produced will go through an incinerator then go to the landfill). It costs $3 per mile to transport a ton of material. Distances (in miles) between locations are shown in the table below.
As the waste disposal planner, you want to minimize the total cost of shipping the waste produced in cities to disposal landfill after incineration. In this problem, you are asked to formulate the above waste disposal planning problem as a minimum cost flow problem.
a) Express the above problem on a network by drawing nodes, arcs, determining node values, arc costs, arc capacities if any, such that no node has a capacity restriction associated with it and no node has a cost for using the node. (Hint: How would you modify your network so that you do not have capacity constraints on your nodes and costs on your nodes?). Then, mathematically formulate the above problem as a minimum cost flow problem using the network representation that you have.
b) Formulate the problem you had in part a in Excel and solve it using excel solver.
The supply chain and the purpose and value in each
: Identifies each link in the supply chain and the purpose and value in each.
|
Comprehensive coverage-causal hypothesis at issue
: “Comprehensive Coverage. The insurer will pay for direct and accidental damage to the insured’s automobile and its equipment not caused by collision or upset.” —From an automobile insurance policy
|
What is the horizontal range observed by a person
: A spring-loaded cannon aimed at 40 degrees above the horizontal is on the last car of a long train of flat cars. What is the horizontal range observed by a person standing on the ground
|
Explain the basic architechture of a knowledge based system
: Describe a design of your chosen system and explain the basic architechture of a knowledge based system.
|
Express the problem on a network by drawing nodes
: Waste Management - Express the problem on a network by drawing nodes, arcs, determining node values, arc costs, arc capacities if any, such that no node has a capacity restriction associated with it and no node has a cost for using the node
|
E-mail marketing
: E-mail Marketing
|
Compute the electric potential at the origin
: A charge of -2.450?C is located at (2.650m , 4.502m ), and a charge of 1.745?C is located at (-2.796m , 0). Find the electric potential at the origin
|
Identify the causal hypothesis at issue
: Identify any instances of pseudoreasoning in the following passage either by naming them or, where they seem not to conform to any of the patterns described in the text, by giving a brief explanation of why the pseudoreasons are irrelevant to the poi..
|
Environmental marketing and sustainable marketing
: Compare and contrast the following terms: societal marketing, social marketing, ecological marketing, green marketing and environmental marketing, and sustainable marketing.
|