Reference no: EM13963017
Precision Manufacturing Inc. (PMI) makes two types of industrial component parts the EX300 and the TX500. An absorption costing income statement for the most recent period is shown below:
Precision Manufacturing Inc.
Income Statement
Sales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,700,000
Cost of goods sold . . . . . . . . . . . . . . . . . . . . . . . $1,200,000
Gross margin . . . . . . . . . . . . . . . . . . . . . . . . . . . $500,000
Selling and administrative expenses . . . . . . . . . $550,000
Net operating loss . . . . . . . . . . . . . . . . . . . . . . . $ (50,000)
PMI produced and sold 60,000 units of EX300 at a price of $20 per unit and 12,500 units of TX500 at a price of $40 per unit. The company's traditional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company's two product lines is shown below:
![634_260-B-M-A-A-B-C (904)-1.png](https://secure.expertsmind.com/CMSImages/634_260-B-M-A-A-B-C (904)-1.png)
The company has created an activity-based costing system to evaluate the profitability of its products. PMI's ABC implementation team concluded that $50,000 and $100,000 of the company's advertising expenses could be directly traced to EX300 and TX500, respectively. The remainder of the selling and administrative expenses was organization-sustaining in nature. The ABC team also distributed the company's manufacturing overhead to four activities as shown below:
![2153_260-B-M-A-A-B-C (904)-2.png](https://secure.expertsmind.com/CMSImages/2153_260-B-M-A-A-B-C (904)-2.png)
Required:
1. Using Exhibit 7-12 as a guide, compute the product margins for the EX300 and TX500 under the company's traditional costing system.
2. Using Exhibit 7-10 as a guide, compute the product margins for EX300 and TX500 under the activity-based costing system.
3. Using Exhibit 7-13 as a guide, prepare a quantitative comparison of the traditional and activity-based cost assignments. Explain why the traditional and activity-based cost assignmentsdiffer.
What is total travel time of pulse as measured by observers
: The mirror is stationary with respect to S. A light pulse emitted by the rocket travels toward the mirror and is reflected back to the rocket. The front of the rocket is a distance 1.88 × 10 ^12 m from the mirror (as measured by observers in S) at..
|
Minimum numbers of rn required
: The 24-hour day has been divided into 7 segments of length 2, 4, or 8 hours. The minimum number of RN's required differs by time of day due to many factors; the minimum numbers of RN's required for each of the seven time segments are:
|
Compute the new capacitance, the potential difference
: The charging battery remains connected and the space between the plates is filled with a material of dielectric constant 5. Compute the new capacitance, the charge, the field strength and the energy stored.
|
Develop and implement a business plan
: Develop and implement a business plan - business plan for Qantas airlines and manage finances within Qantas airlines.
|
Explain why the traditional and activity based cost
: Using Exhibit 7-13 as a guide, prepare a quantitative comparison of the traditional and activity-based cost assignments. Explain why the traditional and activity-based cost assignmentsdiffer.
|
Derive an exact expression for the three dimensional
: Consider a dipole consisting of two charged particles on the x axis, one with positive charge q+ located at x=+1/2d and one with negative q- charge located at x=-1/2d
|
Determine the speed of the shuttle relative to earth
: A spaceship moves away from Earth at a speed 0.874c and fires a shuttle craft that then moves in a forward direction at 0.21c relative to the ship. The pilot of the shuttle launches a probe forward at a speed of 0.412c relative to the shuttle. Det..
|
Five functional constraints for problem
: Write such an equation in terms of the relevant variables above for the beginning of each of the years to obtain the five functional constraints for this problem.
|
Calculate the profit margin ratio and gross profit rate
: Calculate the profit margin ratio and gross profit rate. To qualify for full credit, you must state the formula you are using, show your computations, and explain your findings.
|