Explain why the plot is not linear

Assignment Help Civil Engineering
Reference no: EM131031258

Reconsider Prob. 4-9. Using EES (or other) software, investigate the effect of pressure on the work done. Let the pressure vary from 400 kPa to 1200 kPa. Plot the work done versus the pressure, and discuss the results. Explain why the plot is not linear. Also plot the process described in Prob. 4-9 on the P-v diagram.

Prob. 4-9

A frictionless piston-cylinder device initially contains 200 L of saturated liquid refrigerant-134a. The piston is free to move, and its mass is such that it maintains a pressure of 900 kPa on the refrigerant. The refrigerant is now heated until its temperature rises to 70°C. Calculate the work done during this process.

Reference no: EM131031258

Questions Cloud

The before tax cost of debt for a firm : The before-tax cost of debt for a firm, which has a marginal tax rate of 40 percent, is 12 percent. The after-tax cost of debt is ________.a. 4.8 percent.b. 7.2 percent.c. 12 percent.d. 6.0 percent.
Standard atmospheric pressure : Standard atmospheric pressure (numerical value).Be very specific and to the point if you want me to reward you
What is the typical service life for hydraulic motors : What is the typical service life for hydraulic motors?
Describe and explain how arbitration works : Describe and explain how arbitration works and how it may benefit or hinder either side. Also explain mediation and the various types of alternative dispute resolution used in the airline industry. Give examples and cite your sources.
Explain why the plot is not linear : The refrigerant is now heated until its temperature rises to 70°C. Calculate the work done during this process.
A pitot-static probe is used to measure air velocity : A Pitot-static probe is used to measure air velocity at a temperature of 22oC and a pressure of 98.5 kPa. The pressure difference is 1.00 inches of water column. (Use rwater = 1000 kg/m3 and g = 9.807 m/s2.) a) Calculate the air speed in m/s. Show al..
Using the six sigma approach : Using the Six Sigma Approach (DMAIC), provide an example situation that utilizes the five-step plan, and determine three to four (3-4) challenges you may encounter using this approach. Provide specific examples to support your rationale.
Congressional budget office web site : Predicting the federal budget. Go to the Congressional Budget Office Web site, www.cbo.gov. Under the tab "Publications" (hover over "By Subject") select "Budget and Economic Information" and then "Budget and Economic Outlook."
How important is the should cost analysis : How important is the “should cost” analysis when outsourcing a requirement that is not a core competency of your business? Explain the types of costs associate with the “should cost” analysis.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the compound empirical and molecular formula

A Silane contains 90.31 % silicon and 9.69 % hydrogen by mass. The compound has a molar mass of 62 g/mol. Determine the compound's empirical and molecular formula.

  Determine the elevation of x and y which is required

The elevation of Y is 5265.879 ft. The elevation of X is required. Instrument at X: +S = 3.182,-S = 9.365,9.370, and 9.368. Instrument at Y: +S = 10.223; -S = 4.037,4.041, and 4.038. Find the elevation of X

  Determine the allowable moment about the horizontal neutral

Determine the allowable moment about the horizontal neutral axis that a timber beam with nominal size 50 X 100 can resist without exceeding the allowable stress of 10 MPa. The dressed size is 38.1 X 88.9 mm, I = 0.00000223m^4, and S = 0.0000502 m^3.

  Which option has the lowest overall cost

Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of 2.2$ million per year.

  Show that the car must have exceeded the speed limit of 55

highway patrol officer, you are patricipating in a speed trap. A car passes your patrol car which you clock at 55 mph. One and a half minutes later, your partner in another patrol car situated two miles away from you

  What would be the concentration of pollutant leaving lagoon

A lagoon with volume 1200 m3 has been receiving a steady flow of a conservative waste at a rate of 100 m3/day for a long enough time to assume that steady-state conditions apply.

  What is the pressure difference between two ends of pipe

The pipe contains two 6 in steel elbows, two fully open gate valves, a fully open 90o angle valve, and a swing check valve. If the discharge end of the pipe is located 20 ft higher than the entrance, what is the pressure difference between the two..

  Calculate entropy is this a reversible process

Air enters an adiabatic nozzle at 4MPa and 400 K with a velocit of 25 m/s. Air at the exit is 2 MPa and a velocity of 160 m/s. Calculate entropy? Is this a reversable process?

  Determine the pressure in the tank indicated by strain gage

The cylindrical wall of the tank is 6mm thick, has a 600mm inside diameter, and is made of steel with E = 200 GPa and v = 0.30. Determine the pressure in the tank indicated by a strain gage reading of 280*10^-6 in/in.

  How to determine the diameter of a drilled shaft pile

Using 1630.56 kN as the ultimate capacity determine the diameter of a drilled shaft pile that would have the same ultimate capacity and depth embedment (11.5 m) using the FHWA method. Neglect shaft resistance. Use a F.S. of 2

  Determine the magnitude and directional sense

The railway crossing gate consists of the 100 kg gate arm having a center of mass at Ga and the 250 kg counterweight having a center of mass at Gw. Determine the magnitude and directional sense of the resultant moment produced by the weights about po..

  Determine what is the angle theta required for equilibrium

Rope segment BC creates an angle of phi2 = 74.0^\circ with the floor and rope segment CD creates an angle theta with the horizontal. If both ropes BCA and CD can support a maximum tensile force T3 = 130 lb,

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd