Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question about PH problemWhat is the pH value of water containing 0.005 M of an acid with a acid dissociation constant of 0.001 M. The dissociation of the acid in water can be represented as: HA <-> H+ + A-
Ka=[H][A]/[HA]
Kw=[OH][H]=10^-14
Mass balance equation: Cta=[HA]+[A](MBE)
Charge balance equation: CB = [H]=[A-]+[OH-]
The difference between the total and static pressure before a shock is 75 psi. What is the maximum static pressure that can exist at this point ahead of the shock? The gas is oxygen.
Whether the wall has adequate sliding resistance and whether the wall is safe against over-turning
You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m 3 /hr.
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.
Structural design of reinforced cast in - place concrete - Structure design
To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
Identical bricks 0.1m wide, and weighting 2kg are placed on a plate (assume the plate has neligible weight). Calculate the total weight (and force F required to balance the plate).
What is the design storage and water surface elevation at the peak outflow rate and estimate the long-term average reduction (EPA, 1986) in particulates under dynamic conditions.
Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)
A drinking water treatment plant will be designed to process a flow of 15,000 m3/d. The sedimentation tank will have a residence (detention) time of 4 hours and the overflow rate (Q/A) of 16 m 3 /m 2 -day. Estimate the required surface area (A), an..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd