Explain the use of construction information in the context

Assignment Help Civil Engineering
Reference no: EM133204694

N5E06 Construction Information (Drawing, Detailing, Specification) - Level 5 Higher National Diploma in Construction and the Built Environment

Construction Information (Drawing, Detailing, Specification)

LO1 Evaluate different types of construction information in the context of diverse project types.

LO2 Develop construction drawings, details, schedules and specifications in support of a given construction project.

LO3 Interpret different types of construction information in order to explain a construction project.

LO4 Assess ways in which construction professionals collaborate in the production of construction information.

P1 Explain the use of construction information in the context of a project.

P2 Describe the different types of construction information and their uses.

P3 Develop a set of general arrangement drawings, selected details and door/window schedules.

P4 Produce an outline bill of quantities.

P5 Relate a set of construction drawings to a specification.

P6 Evaluate construction drawings and details to identify ‘clashes'.

P7 Assess the types of information produced by different participants in a construction project.

P8 Examine the relationship between different bodies of information and how they work in conjunction.

M1 Compare different types of construction information to identify their suitability in specific contexts.

M2 Compose a schedule of works.

M3 Critique a body of construction information, identifying errors and discrepancies.

M4 Compare the roles of CAD and BIM in the collaborative production of construction information.

D1 Justify the use of specific types of construction information in support of a given project.

D2 Propose corrections to construction drawings and specifications using industry standard forms of notation.

Scenario
You have recently been employed as a civil engineering technician. Your employer, a medium-sized general contractor, has been commissioned to design and build a small building in a local industrial park. The design team within the company has prepared a set of outline design drawings, which provide general information about the proposed building, site and form.

You are tasked with the responsibility of preparing the construction information package that will allow the construction team to build the project. The package of information required includes the following:
• Site Location Plan
• Site plan
• Floor plan
• Elevations
• Section/Details
• Door and window schedules
• Outline bill of quantities
• Schedule of works

Accompanying the construction information package, your employer wishes to understand your reasons for the drawings, specification and schedules that you have produced.

The submission is comprised of two parts:
1. Construction Infrmation; to include:
a) Site Location Plan (1:1250)
b) Site plan (1:500 or 1:1000)
c) Floor plan (1:50 or 1:100)
d) Elevations (1:50 or 1:100)
e) Section (1:20)
f) Detail(s) (1:5)
g) Door and window schedules
h) Outline bill of quantities
i) Schedule of works

All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information and be numbered using an industry standard.

Drawings should be produced using an industry standard CAD software package. BIM software may be used but is not required.

2.A written report - this should be a justification of your decisions for producing specific information for the project and compare the choices you have made with other potential information types.

Scenario
One of your colleagues, in a medium-sized general contracting firm, has produced a set of construction information documents for a small industrial building. Before issuing this information to the construction team, your employer has asked that you review the information to ensure that it is fit-for-purpose. In particular, your employer asks you to:

• coordinate the drawings with the schedules, specifications and bill of quantities
• identify any information clashes
• highlight areas where there may be missing, or incorrect information provided.

You are then tasked with making corrections to the construction information, ensuring that copies of the originals and your recommended changes are recorded.

Finally, you are asked to prepare a short report on the construction information package that you have reviewed. You will discuss your findings with the original author of this work, as part of both of your continuing professional development.

The submission is comprised of two parts:

1. Construction Information Review; to include:
a. ‘Redlined' construction drawings (highlighting errors or inaccuracies)
b. ‘Marked-up' specifications and schedules (highlighting errors or inaccuracies)
c. Corrected versions of all documentation, with suitable revisions recorded.

2. Feedback Report - Produce a report explaining the design team roles (such as Architect, Landscape Architect, Quantity Surveyor, Civil Engineer, Building Services Engineer etc), how they work with each other and assessing the types of information produced by each. The report should also highlight and compare the impact of CAD and BIM in the collaborative process of producing construction information.

Attachment:- Construction Information Drawing Detailing.rar

 

Reference no: EM133204694

Questions Cloud

Calculate the accounting break-even quantity : Jasper Auto Inc is going to invest in a new machine to produce Part A. The cost of the machine is $400,000. Part A will have variable cost per unit of $75.00 an
What types of conditions do scientists claim to be on moon : What types of conditions do scientists claim to be on the planet or moon? How strong is the evidence? Is there a large body of evidence that this is true?
Describe first and second generation cpted : Describe 1st and 2nd generation CPTED, how they differ, and how they complement each other. Using the 3Ds concept of CPTED, describe how they function
Rewarded for systematic or unsystematic risk : a. Portfolio A contains stocks A and B. Stock A and B are perfectly positively correlated. Portfolio B contains stocks D and E.
Explain the use of construction information in the context : Explain the use of construction information in the context of a project and Describe the different types of construction information and their uses
Discuss the five processes of project management : Discuss the five (5) processes of project management. As a manager, how would one plan, track, and manage projects, and what software could one use
Prepare a briefing that identifies your top five strategies : Prepare a briefing that identifies your top 5 strategies and explains why you chose each one. Provide examples of type of policies which need to be communicated
Create a business plan for T-Mobile : Using the data that has been provided, create a business plan for T-Mobile - Includes the financial position of each company
Influence of organizational principles on communication : Discuss the influence of organizational principles on communication, facilitation, collaborative planning, and decision-making.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd