Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1.A 300 acre parking lot has a runoff coefficient of 0.8 and a time of concentration of 40 minutes. Using the rational method (Q=CIA), what is peak Q if a 4"/hr rain falls for 10 minutes?
2.Coal has about 2% sulphur. how many kilograms of sulphur would be emitted from coal fired power plants in the united states in 1 year?(u.s electricity production is about 0.28*10^12 watts and coal has an energy content of about 30*10^6 j/kg. note that 1j=1w-sec)
3.Explain the slipping of atoms and the effect on material deformation.
4.Brine flood in a 1.9-in-long and 1.5-in-diameter core plug from the North Sea resulted in a stabilized pressure drop of 46.05 psi. The flood was carried out at 0.05 mL/min with brine viscosity of 0.443 cP. Determine the absolute permeability of this plug in millidarcies.
A 4 meter long steel plate with a rectangular cross section (10mm x 50mm) is resting on a frictionless surface under the sun. The plate temperature is measured to be at 40 degrees Celsius.
A line passes through the points (22 m, 19 m) and (-2 m,-5 m). determine the perpendicular distance d from the line to the origin O of the system of coordinates.
On a single graph, show how the Gibbs energies of each of these phases vary with temperature between - 20 C and 150 C for a constant pressure of 80 kPa. You can start your computations at the triple point
Groundwater in Taupe, Arizona, initially contains 1.8 mg/L of iron(III). What must the pH be raised to in order to precipitate 0.3 mg/L of the iron
The channel cross section is rectangular in shape,with a bed width of 4 m and Manning n of 0.022. The bed drops by an average of 4.2metres every kilometre. The maximum flow in the channel is equal to 7 m3/s.
you have been selected to assist the structural engineer for a bridge replacement project. your task is to design the
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
Annual rare based on amount of products which can ordinarily be shipped each year as a function of the amount of vehicles or service purchased with the first cost and the M&O costs.
A Carnot heat engine is supplied with a high temperature heat source at a rate of 200 kW. If the power output of the heat engine is 120 kW, determine the required source temperature if the heat sink temperature is 20 °C.
A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state
A 420 kW pump delivers gasoline at a rate of 1.28 m^3/s through a horizontal pipe. The average roughness height is 0.005 cm. The total length of the pipe is 46 m. Calculate the pipe diameter.
The system shown consists of a member which is built in to rigidfoundations at both ends. It is unstrained in the horizontalposition. But then it is put in an upright position, and hence issubject to gravity. Find the stress and strain as a function ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd