Explain the purpose of a change control plan

Assignment Help Other Subject
Reference no: EM133086052

BSBPMG530 Manage Project Scope

Assessment task 1: Short Answer Questions

In this assessment, you will demonstrate a sound knowledge of the unit requirements through completing and submitting written questions.
You must correctly answer all questions to show that you understand the knowledge required of this unit.

Question 1: Identify and describe two documents that can be used to initiate projects.

Question 2: Identify and describe two key components of a project scope management plan.

Question 3: Describe two factors that can impact on a project scope.

Question 4: Explain the purpose of a change control plan within a project scope management plan, and summarise the key processes that should be followed in order to control changes within a project.

Question 5: Explain two methods that can be used to measure project outcomes and progress and provide example to illustrate each.

Question 6: Describe two methods for segmenting and documenting a work break down structure (WBS).

Question 7: Identify and describe two problem areas likely to be encountered in scope management.

Question 8: Explain the concept of the project life cycle and the importance of scope management within this cycle.

Question 9: Identify three project management tools and explain their use in project scope management.

Question 10: Outline the key role and at least four responsibilities of a project manager when planning a project.

Assessment 2 - You are required to demonstrate your skills and knowledge by working through a number of activities and completing and submitting a project portfolio

Assessment Task 2: Project Portfolio

Information for students

In this task, you are required to demonstrate your skills and knowledge by working through a number of activities and completing and submitting a project portfolio.

You will need access to:
• a suitable place to complete activities that replicates a business environment including a meeting space and computer and internet access
• your learning resources and other information for reference
• Project Portfolio template
• Simulation Pack (if you need a case study). Ensure that you:
• review the advice to students regarding responding to written tasks in the Business Works Student User Guide
• comply with the due date for assessment which your assessor will provide
• adhere with your RTO's submission guidelines
• answer all questions completely and correctly
• submit work which is original and, where necessary, properly referenced
• submit a completed cover sheet with your work
• avoid sharing your answers with other students.

Activities
Complete the following activities:

1. Carefully read the following:

This project requires you to determine and manage a project scope on two separate occasions. For each project scope, you must obtain project authorisation, develop a scope management plan and manage project scope changes.
You can do this for two real projects at your workplace, for two projects associated with a start-up business you are working on yourself or you can use the Simulation Pack provided.

If you use your own business or workplace, make sure it has policies and procedures that address project management (including project authorisation and change control procedures) and communication protocols already developed. Your projects should require at least one scope change each (see step 6 for more details). You should also have sufficient numerical information to monitor the impact of the scope changes to the timing, cost and quality constraints of the project. Speak to your assessor to get approval if you want to base this on your own business.
If you are basing this assessment on the case study business, read through the Simulation Pack in preparation for this assessment. All the information needed to complete this assessment is contained in the Simulation pack.
You will be collecting evidence for this unit in a Project Portfolio. The steps you need to take are outlined below. Before you begin, complete page 4 of your Project Portfolio. You must describe the organisation you are basing this assessment on and provide a short description of two projects for which you'll manage the scope.

2. For each project, write a project authorisation request.

Before you begin, make sure you are familiar with any policies, procedures, protocols and templates that address project management.
If you are basing this assessment on the case study, review Native Bush Spices Australia's project management policy and procedures, communication policy and procedures as well as the Project Authorisation Template.
You are required to write a Project authorisation request. As part of this request:
• provide a broad overview of the project (so as to gain initial approval).
• briefly describe the project goals and deliverables, as well as the benefits and impact on the organisation.
• briefly describe the resources that will be required to conduct this project, including the proposed budget.
• provide a high-level project schedule.
• briefly describe the proposed project governance arrangements in accordance with the project management policy and procedure (i.e. what are the proposed/allowed project delegations and authorisations?).
• request authorisation to proceed to the detailed planning phase of the project.

3. Seek authorisation to proceed.

Draft an email to an appropriate senior manager to request authorisation for your project (assume that your written Project authorisation request is attached to the email).
Your email should introduce and summarise the contents of the written Project authorisation request and seek their feedback and approval to move forward with the project. In particular:
• confirm that the details in the Project authorisation request are approved.
• seek authorisation to utilise the listed resources.
• confirm that the project delegations and authorisations are acceptable.
Separate emails are required for each project.
The text of the email should be in grammatically correct English, written in an appropriate (polite, business-like) style.

You are required to attach certain documents as part of your evidence - review the documents you need to attach as outlined in Section 1 of the Project Portfolio.

4. For each project, meet with stakeholders to determine, negotiate and agree on the project scope.

Assume that you have been provided with approval to proceed with the project as set out in your project authorisation request.
You are required to meet with at least two stakeholders for each project. If you are using the case study, assume you are meeting with the Operations Manager and CEO of Native Bush Spices Australia.
Prepare for the meeting by reading through steps 4 and 5 and making notes to guide your discussion.

At the meeting, you will be required to:
• negotiate project boundaries (such as the budget or timelines)
• agree on the desired project outcomes.
• agree on scope management procedures and processes.
Each meeting should take 20 minutes. This will either be attended in person by your assessor or they will attend online. If you are in the workplace, you may like to video record the session for your assessor to watch later (attach proof to Section 1 of your portfolio). Your assessor can provide you with more details at this step. Make sure you follow the instructions above and meet the timeframes allocated.
During the meeting, you will need to demonstrate effective communication and negotiation skills including:
• using non-verbal communication to assist with understanding
• asking questions to identify required information
• responding to questions as required
• using active listening techniques to confirm understanding
• being prepared for negotiation
• facilitating agreement on outcomes
• using problem solving skills to identify solutions

For each project, document the project scope
Before you begin, review the following links. You may use them to assist you in developing your plan.

Based on the outcomes of your meeting with the stakeholders, develop a detailed project scope management plan. Your plan should reflect what was discussed at the meeting and:
• provide an introduction and background to the project, including business needs and drivers.
• explain measurable project benefits.
• outline the criteria for success for the project (outcomes and outputs).
• describe at least one project assumption.
• describe at least one factor on which the project is dependent.
• describe at least one project constraint.
• describe at least two project risks.
• identify the project stakeholders,
• develop and document the Work Breakdown Structure.
• describe scope control management processes that will be followed (include procedures for changes to the project scope, such as a written change request - step 6 will require you to implement this).

Separate plans are required for each project.
If your business has its own Project scope template, use it (make sure you include all the requirements listed above). Otherwise, use the template provided in the Simulation Pack.

The text of the Project scope should be in grammatically correct English, written in an appropriate (polite, business-like) style.
If you are using the case study (Native Bush Spices Australia):
For the web-design project: to develop the work breakdown structure, you must research the typical steps involved with developing a website, assuming this work will be contracted out to website designers and content writers.
For the product range expansion project: to develop the work breakdown structure, you must research the typical steps involved with market research and establishing collaborative relationships, assuming that the Operations Manager of Native Bush Spices Australia will meet with potential organisations and choose the best partnership.

You are required to attach certain documents as part of your evidence - review the documents you need to attach as outlined in Section 2 of the Project Portfolio.

If you are basing this assessment on Native Bush Spices Australia, further information to complete the next steps is available in the Simulation Pack.
If you are basing this assessment on your own business or workplace, your projects should require at least one scope change each. You should have sufficient numerical information to monitor the impact of the scope changes to the timing, cost and quality constraints of the project.

6. For both projects, implement change procedures.

Write a change request for at least one change.
Separate change requests are required for each project.
If your business has its own Change request template, use it. Otherwise, use the template provided in the Simulation Pack.
The text of the Change request should be in grammatically correct English, written in an appropriate (polite, business-like) style.

7. Manage the scope changes.

Write a draft email to an appropriate senior manager to request authorisation for the change (assume that your written Change request is attached to the email).

Your email should:
• introduce and summarise the contents of the change request.
• explain the impact of the changes on the timing, cost and quality constraints on the project.
• ask for their feedback and approval.
• list any scope management issues you've experienced in the project so far (at least one).
• recommend improvements for future projects (at least one).
Separate emails are required for each project.
The text of the email should be in grammatically correct English, written in an appropriate (polite, business-like) style.
If you are basing this assessment on Native Bush Spices Australia, the email should be sent to the Operations Manager.

8. Document scope changes

Assume that your requested changes have been approved.
If you are basing this assessment on the case study, assume that the Operations Manager has approved an increase in the budget to allow Visualweb to develop the website.
Update your project scope document to reflect the changes.
Highlight your changes to make them obvious (e.g. using a different colour or a highlighting tool).
Change the version number of your scope document.

Attachment:- Manage Project Scope.rar

Reference no: EM133086052

Questions Cloud

Describe the financial statement fraud : Describe the financial statement fraud that occurred at Parmalet and Satyam. What are the lessons for the auditor
Resistance to change : Choose an organization and identify an area in which it needs to communicate a change. What type of change agent and change model needs to be implemented?
How much is the true net income of the branch : Prepaid selling expenses P150- Merchandise Inventory end P16,950 (2,750 from outside purchases) How much is the true net income of the branch
Supply chain management : Why is transportation important to supply chain management? How does forecasting play a part in a successful supply chain management program?
Explain the purpose of a change control plan : Identify and describe two documents that can be used to initiate projects and Describe two factors that can impact on a project scope
What is the largest mortgage the lender will give : The lender also has a maximum LTV threshold of 70%. What is the largest mortgage the lender will give Ann based on both the LTV and DSCR requirements
The panama canal is undergoing a major widening : The Panama Canal is undergoing a major widening. create a competitive advantage as a result of the widening and the post-Panamax hulls?
How much did the bond sell for : Question - On Jan 1, year 1, ABC corp. issued bonds as follows: Face value $790000. How much did the bond sell for
What are operational inventories : What are operational inventories and how can flexibility be achieved to adjust to unexpected demand surges

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd