Explain the core job characteristics

Assignment Help HR Management
Reference no: EM131877494

Problem: The Hovey and Beard Company manufactures a variety of wooden toys, including animals, pull toys, and the like.1 The toys were manufactured by a transformation process that began in the wood room. There, toys were cut, sanded, and partially assembled. Then the toys were dipped into shellac and sent to the painting room. In years past, the painting had been done by hand, with each employee working with a given toy until its painting was completed. The toys were predominantly painted with two colors, although a few required more colors. Now, in response to increased demand for the toys, the painting operation was changed so that the painters sat in a line by an endless chain of hooks. These hooks moved continuously in front of the painters and passed into a long horizontal oven. Each painter sat in a booth designed to carry away fumes and to backstop excess paint. The painters would take a toy from a nearby tray, position it in a jig inside the painting cubicle, spray on the color according to a pattern, and then hang the toy on a passing hook.

The rate at which the hooks moved was calculated by the engineers so that each painter, when fully trained, could hang a painted toy on each hook before it passed beyond reach. The painters were paid on a group bonus plan. Since the operation was new to them, they received a learning bonus that decreased by regular amounts each month. The learning bonus was scheduled to vanish in six months, by which time it was expected that they would be on their own-that is, able to meet the production standard and earn a group bonus when they exceeded it. By the second month of the training period, trouble developed. The painters learned more slowly than had been anticipated, and it began to look as though their production would stabilize far below what was planned. Many of the hooks were going by empty. The painters complained that the hooks moved too fast and that the engineer had set the rates wrong. A few painters quit and had to be replaced with new ones. This further aggravated the learning problem.

The team spirit that the management had expected to develop through the group bonus was not in evidence except as an expression of what the engineers called "resistance." One painter, whom the group regarded as its leader (and the management regarded as the ringleader), was outspoken in taking the complaints of the group to the supervisor. These complaints were that the job was messy, the hooks moved too fast, the incentive pay was not correctly calculated, and it was too hot working so close to the drying oven. A consultant was hired to work with the supervisor. She recommended that the painters be brought together for a general discussion of the working conditions. Although hesitant, the supervisor agreed to this plan. The first meeting was held immediately after the shift was over at 4:00 p.m. It was attended by all eight painters. They voiced the same complaints again: The hooks went by too fast, the job was too dirty, and the room was hot and poorly ventilated. For some reason, it was this last item that seemed to bother them most. The supervisor promised to discuss the problems of ventilation and temperature with the engineers, and a second meeting was scheduled. Over the next few days, the supervisor had several talks with the engineers.

They, along with the plant superintendent, felt that this was really a trumped-up complaint and that the expense of corrective measures would be prohibitively high. The supervisor came to the second meeting with some apprehension. The painters, however, did not seem to be much put out. Rather, they had a proposal of their own to make. They felt that if several large fans were set up to circulate the air around their feet, they would be much more comfortable. After some discussion, the supervisor agreed to pursue the idea. The supervisor and the consultant discussed the idea of fans with the superintendent. Three large propeller-type fans were purchased and installed. The painters were jubilant. For several days the fans were moved about in various positions until they were placed to the satisfaction of the group. The painters seemed completely satisfied with the results, and the relations between them and the supervisor improved visibly. The supervisor, after this encouraging episode, decided that further meetings might also prove profitable. The painters were asked if they would like to meet and discuss other aspects of the work situation.

They were eager to do this. Another meeting was held, and the discussion quickly centered on the speed of the hooks. The painters maintained that the engineer had set them at an unreasonably fast speed and that they would never be able to fill enough of them to make a bonus. The discussion reached a turning point when the group's leader explained that it wasn't that the painters couldn't work fast enough to keep up with the hooks but that they couldn't work at that pace all day long. The supervisor explored the point. The painters were unanimous in their opinion that they could keep up with the belt for short periods if they wanted. But they didn't want to because, if they showed they could do this for short periods, then they would be expected to do it all day long. The meeting ended with an unprecedented request by the painters: "Let us adjust the speed of the belt faster or slower depending on how we feel." The supervisor agreed to discuss this with the superintendent and the engineers. The engineers reacted negatively to the suggestion. However, after several meetings it was granted that there was some latitude within which variations in the speed of the hooks would not affect the finished product.

After considerable argument with the engineers, it was agreed to try out the painters' idea. With misgivings, the supervisor had a control with a dial marked "Low, Medium, Fast" installed at the booth of the group leader. The speed of the belt could now be adjusted anywhere between the lower and upper limits that the engineers had set. The painters were delighted and spent many lunch hours deciding how the speed of the belt should be varied from hour to hour throughout the day. Within a week the pattern had settled down to one in which the first half hour of the shift was run on a medium speed (a dial setting slightly above the point marked "Medium"). The next two and a half hours were run at high speed, and the half hour before lunch and the half hour after lunch were run at low speed. The rest of the afternoon was run at high speed with the exception of the last forty-five minutes of the shift, which was run at medium. The constant speed at which the engineers had originally set the belt was actually slightly below the "Medium" mark on the control dial; the average speed at which the painters were running the belt was on the high side of the dial.

Few, if any, empty hooks entered the oven, and inspection showed no increase of rejects from the paint room. Production increased, and within three weeks (some two months before the scheduled ending of the learning bonus) the painters were operating at 30 to 50 percent above the level that had been expected under the original arrangement. Naturally, their earnings were correspondingly higher than anticipated. They were collecting their base pay, earning a considerable piece-rate bonus, and still benefiting from the learning bonus. They were earning more now than many skilled workers in other parts of the plant. Management was besieged by demands that the inequity between the earnings of the painters and those of other workers in the plant be rectified. With growing irritation between the superintendent and the supervisor, the engineers and supervisor, and the superintendent and engineers, the situation came to a head when the superintendent revoked the learning bonus and returned the painting operation to its original status: The hooks moved again at their constant, time-studied, designated speed. Production dropped again, and within a month all but two of the eight painters had quit. The supervisor stayed on for several months, but, feeling aggrieved, left for another job.

1. How does the painters' job score on the core job characteristics before and after the changes were made? How can the positive impact of the job redesign be explained?

Reference no: EM131877494

Questions Cloud

What is the maximum total cost the buyer can pay : A hosiery buyer plans to purchase 7,200 pairs of socks for a pre-Christmas sale. The unit retail price is planned at $7.50, and the markup goal.
Most recent statement of cash flows : Messy-Kruger Corp. reported the following amounts on their most recent statement of cash flows: · Cash flow from investing activities
Practice problems financial statement analysis : What was the capital spending for LMC in 20Y5? Practice Problems Financial Statement Analysis.
How can you join wow and what does it cost to join : How can you join WOW? What does it cost to join? List one of the events that WOW participates in. Would you like to attend this event? Why or why not?
Explain the core job characteristics : How does the painters' job score on the core job characteristics before and after the changes were made? How can the positive impact of the job redesign.
Amount of dividends did cornhole pay : What amount of dividends did Cornhole pay to its common shareholders during 20Y5?
What exactly is meant by exchange rate risk : Describe and provide a numerical example of the forward exchange contract as a method to reduce the exchange rate risk.
Determine the local chapter closest to you : Determine the local chapter closest to you. Visit its Web site. List the Web site URL and an activity or service that the chapter provides.
Compute the? bond yield to maturity : The market price of the bonds is $1,150 and the? market's required yield to maturity on a? comparable-risk bond is 5 percent.

Reviews

Write a Review

HR Management Questions & Answers

  Improve problem solving capabilities within organization

Types of teams as to their effectiveness that will improve problem solving capabilities within organizations.

  Influence tactics help in reducing organizations politics

Explain the different types of influence tactics that will be of a help “if adopted” in reducing the organizational politics.

  Report on citigroup''s hr service level agreement

Human Resources or Human Resource Management deals with HR Service Level Agreement. HR Service Level Agreement is an agreement made between the employer and the employee, which states that the employee would work under any client and sometimes any ti..

  A project report on hrm

Human Resource Management as the name suggests, it is a management discipline which deals with the human i.e. the workforce aspect of organizations. Need and practices of HRM are inevitable in present scenario of extreme competition where "Talent War..

  Hrp: recruitment and selection

Recruitment and Selection is the initial ladder of any Human Resource Planning process and contains an immense significance for any organisation.

  A project report on study of statutory complainces

Statutory compliance and its immense knowledge are crucial to be understood in an organization. It contains all the forms, procedures and acts applicable in a company.

  Operant conditioning and Reinforcement

Operant conditioning is a learning process where behaviour is controlled by its consequences. In this process an individual's behaviour can be modified through the use of positive or negative reinforcement.

  Effectiveness of training programs in achieving customers an

The main motive for conducting this research is to provide broad range of research of the literature and their reviews related to training and development and assisting the employees in providing customers satisfaction.

  A critical analysis of hr processes and practices in fedex c

FedEx is illustrious for its novel HR processes and practices that have greatly accounted for its success.

  Integrating culture and diversity in decision making

People in the organization are known as Google where they share common goals and have common vision.

  Impact of employee attrition on people management in organis

Talent management implies recognizing a person's inherent skills, traits, personality and offering him a matching job.

  Labour dissonance at maruti suzuki india limited: a case stu

This Case Study focuses on various issues related to Labour Unrest at Maruti Suzuki India Limited.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd