Arctic Mining Consultants

Tom Parker enjoyed working outdoors. At various times in the past, he worked as a ranch hand, high steel rigger, headstone installer, prospector, and geological ?eld technician. Now 43, Parker is a geological ?eld technician and ?eld coordinator with Arctic Mining Consultants. He has specialized knowledge and experience in all nontechnical aspects of mineral exploration, including claim staking, line cutting and grid installation, soil sampling, prospecting, and trenching. He is responsible for hiring, training, and supervising ?eld assistants for all of Arctic Mining Consultants’ programs. Field assistants are paid a fairly low daily wage (no matter how long they work, which may be up to 12 hours or more) and are provided meals and accommodation. Many of the programs are operated by a project manager who reports to Parker. Parker sometimes acts as a project manager, as he did on a job that involved staking 15 claims near Eagle Lake, Alaska. He selected John Talbot, Greg Boyce, and Brian Millar, all of whom had previously worked with Parker, as the ?eld assistants. To stake a claim, the project team marks a line with ?agging tape and blazes along the perimeter of the claim, cutting a claim post every 500 yards (called a length). The 15 claims would require almost 60 miles of line in total. Parker had budgeted seven days (plus mobilization and demobilization) to complete the job. This meant that each of the four stakers (Parker, Talbot, Boyce, and Millar) would have to complete a little more than seven lengths each day. The following is a chronology of the project.

Day 1 The Arctic Mining Consultants crew assembled in the morning and drove to Eagle Lake, from where they were ?own by helicopter to the claim site. On arrival, they set up tents at the edge of the area to be staked and agreed on a schedule for cooking duties. After supper, they pulled out the maps and discussed the job—how long it would take, the order in which the areas were to be staked, possible helicopter landing spots, and areas that might be more dif?cult to stake. Parker pointed out that with only a week to complete the job, everyone would have to average seven and a half lengths per day. “I know that is a lot,” he said, “but you’ve all staked claims before and I’m con ?dent that each of you is capable of it. And it’s only for a week. If we get the job done in time, there’s a $300 bonus for each man.” Two hours later, Parker and his crew members had developed what seemed to be a workable plan.

Day 2 Millar completed six lengths, Boyce six lengths, Talbot eight, and Parker eight. Parker was not pleased with Millar’s or Boyce’s production. However, he didn’t make an issue of it, thinking that they would develop their rhythm quickly.

Day 3 Millar completed ?ve and a half lengths, Boyce four, and Talbot seven. Parker, who was nearly twice as old as the other three, completed eight lengths. He also had enough time remaining to walk over and check the quality of stakes that Millar and Boyce had completed, then walk back to his own area for helicopter pickup back to the tent site. That night Parker exploded with anger. “I thought I told you that I wanted seven and a half lengths a day!” he shouted at Boyce and Millar. Boyce said that he was slowed down by unusually thick underbrush in his assigned area. Millar said that he had done his best and would try to pick up the pace. Parker did not mention that he had inspected their work. He explained that as far as he was concerned, the ?eld assistants were supposed to ?nish their assigned area for the day, no matter what. Talbot, who was sharing a tent with Parker, talked to him later. “I think that you’re being a bit hard on them, you know. I know that it has been more by luck than anything else that I’ve been able to do my quota. Yesterday I only had ?ve lengths done after the ?rst seven hours and there was only an hour before I was supposed to be picked up. Then I hit a patch of really open bush, and was able to do three lengths in 70 minutes. Why don’t I take Millar’s area tomorrow and he can have mine? Maybe that will help.” “Conditions are the same in all of the areas,” replied Parker, rejecting Talbot’s suggestion. “Millar just has to try harder.”

Day 4 Millar did seven lengths and Boyce completed six and a half. When they reported their production that evening, Parker grunted uncommunicatively. Parker and Talbot did eight lengths each.

Day 5 Millar completed six lengths, Boyce six, Talbot seven and a half, and Parker eight. Once again Parker blew up, but he concentrated his diatribe on Millar. “Why don’t you do what you say you are going to do? You know that you have to do seven and a half lengths a day. We went over that when we ?rst got here, so why don’t you do it? If you aren’t willing to do the job then you never should have taken it in the ?rst place!” Millar replied by saying that he was doing his best, that he hadn’t even stopped for lunch, and that he didn’t know how he could possibly do any better. Parker launched into him again: “You have got to work harder! If you put enough effort into it, you will get the area done!” Later Millar commented to Boyce, “I hate getting dumped on all the time! I’d quit if it didn’t mean that I’d have to walk 50 miles to the highway. And besides, I need the bonus money. Why doesn’t he pick on you? You don’t get any more done than me; in fact, you usually get less. Maybe if you did a bit more he wouldn’t be so bothered about me.” “I only work as hard as I have to,” Boyce replied.

Day 6 Millar raced through breakfast, was the ?rst one to be dropped off by the helicopter, and arranged to be the last one picked up. That evening the production ?gures were Millar eight and a quarter lengths, Boyce seven, and Talbot and Parker eight each. Parker remained silent when the ?eld assistants reported their performance for the day.

Day 7 Millar was again the ?rst out and last in. That night, he collapsed in an exhausted heap at the table, too tired to eat. After a few moments, he announced in an abject tone, “Six lengths. I worked like a dog all day and I only got a lousy six lengths!” Boyce completed ?ve lengths, Talbot seven, and Parker seven and a quarter. Parker was furious. “That means we have to do a total of 34 lengths tomorrow if we are to ?nish this job on time!” With his eyes directed at Millar, he added, “Why is it that you never ?nish the job? Don’t you realize that you are part of a team, and that you are letting the rest of the team down? I’ve been checking your lines and you’re doing too much blazing and wasting too much time making picture-perfect claim posts! If you worked smarter, you’d get a lot more done!”

Day 8 Parker cooked breakfast in the dark. The helicopter drop-offs began as soon as morning light appeared on the horizon. Parker instructed each assistant to complete eight lengths and, if they ?nished early, to help the others. Parker said that he would ?nish the other 10 lengths. Helicopter pickups were arranged for one hour before dark. By noon, after working as hard as he could, Millar had only completed three lengths. “Why bother,” he thought to himself, “I’ll never be able to do another ?ve lengths before the helicopter comes, and I’ll catch the same amount of abuse from Parker for doing six lengths as for seven and a half.” So he sat down and had lunch and a rest. “Boyce won’t ?nish his eight lengths either, so even if I did ?nish mine, I still wouldn’t get the bonus. At least I’ll get one more day’s pay this way.” That night, Parker was livid when Millar reported that he had completed ?ve and a half lengths. Parker had done ten and a quarter lengths, and Talbot had completed eight. Boyce proudly announced that he ?nished seven and a half lengths, but sheepishly added that Talbot had helped him with some of it. All that remained were the two and a half lengths that Millar had not completed. The job was ?nished the next morning and the crew demobilized. Millar has never worked for Arctic Mining Consultants again, despite being offered work several times by Parker. Boyce sometimes does staking for Arctic, and Talbot works full-time with the company.

Question: Fully explain how Attribution Theory is a factor in this case, but explain in terms of specific Attribution Theory concepts.

Reference no: EM132267930

Questions Cloud

Organizational structure of southwest : Would you change anything about Organizational structure of Southwest and how?
With eye toward the organizational culture : Read “BP and the Deepwater Horizon Disaster of 2010” with an eye toward the organizational culture.
Respond to each paragraph without using any source : Respond to each paragraph with one paragraph without using any source from the Internet. Ecofeminism is a part of environmental ethics
Why the award winning company was successful from learning : Explain how the "Award Winning" company can benefit from using the BSC method as a strategic control system based on the information in the business case.
Explain in terms of specific attribution theory concepts : Fully explain how Attribution Theory is a factor in this case, but explain in terms of specific Attribution Theory concepts.
How do individuals leading an organization shape the outcome : If one person could represent everything about an organization's mission and vision, who would that person be? How do the individuals leading an organization.
Report on success factors of a food and beverage operation : 01 FBB - Managing the Food and Beverage Business - Oman tourism college - Write a report on the success factors of a Food and Beverage Operation
What topics should be included in security education : Discuss the importance of user technology security education within organizations. What topics should be included in security education and training?
Discuss the strategies used to manage market risks : Discuss in details the strategies used for managing social risks. Discuss the strategies used to manage market risks.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd