Reference no: EM13307839
Scenario
ou have been asked to be the project manager for the development of an information technology (IT) project. The system to be developed will allow a large company to coordinate and maintain its records of the professional development of its employees. The company has over 30,000 employees, who are located in four sites: Florida, Colorado, Illinois, and Texas. The system must allow employees to locate and schedule professional-development activities that are relevant to their positions. Sophisticated search capabilities are required, and the ability to add scheduled events to the employees' calendars is desired. The system needs to support social networking, which will allow employees to determine who is attending various conferences and events. This will promote the fostering of relationships and ensure that the company has representation at important conferences.
Once an activity has been completed, employees will use the system to submit the documentation. The system should support notifications, which will allow managers to receive notice whenever their direct reports have submitted documentation. The system should also notify employees if their deadline to complete professional-development requirement is approaching and it has not yet been completed.
Project charter: Using the above scenario, develop a project charter. Include the problem statement, justification for the project, and how the project will be measured for success.
Stakeholders:Identify the stakeholders, their roles, and the influence level that they will have on the outcome of the project. Identify the project sponsor.
What is the most likely cause of the problem
: Some time later, Leo calls you back to tell you that while he is able to access the Trinity folder and read the files stored there, he has been unable to save changes back to the server. What is the most likely cause of the problem?
|
Can one collector be temporarily taken out of service
: Dust is removed from the airstream of a municipal incinerator by four dust collectors operating in parallel, each handling 1/4 of the total airflow of 200 m3/min. The airstream contains 10 g/m3 of suspended solids.
|
Determine the resultant work done on the car
: A 1500 kg car increases its speed from 15 m/s to 18 m/s in 15 seconds. What is the resultant work done on the car
|
Write the string to the ofstream
: Close the ifstream and ofstreams when finished. 9. Make sure that your program allows the user to encrypt / decrypt more than one file per session. This means adding a loop which allows the entire program to repeat until the user has nothing more ..
|
Explain how to develop a project charter
: Using the above scenario, develop a project charter. Include the problem statement, justification for the project, and how the project will be measured for success.
|
Find the value of the magnetic field at the center of ring
: consider a thin wire bent into the shape of a ring of radius of 10 cm that carries a steady 2.0-A current
|
Evaluate the strategy that led to the merger or acquisition
: For the corporation that has acquired another company, merged with another company, or been acquired by another company, evaluate the strategy that led to the merger or acquisition to determine whether or not this merger or acquisition was a wise cho..
|
What is the peak voltage of the generator
: The rms current in a solenoid is 0.036 A when the solenoid is connected to a 18 kHz generator. What is the peak voltage of the generator
|
Write a program that tests all fetures of new instruction
: Implement a new nonunary instruction in place of NOP called ASLMANY whose operand is the number of times the accumulator is shifted left. Allow immediate, direct, and stack-relative addressing.
|