Reference no: EM131441688
L. Winston Martin (an allergist) has an excellent system for handling his regular patients who come in just for allergy injections. Patients arrive for an injection and fill out a name slip, which is then placed in an open slot that passes into another room staffed by one or two nurses. The specific injections for a patient are prepared, and the patient is called through a speaker system into the room to receive the injection. At certain times during the day, patient load drops and only one nurse is needed to administer the injections.
Let’s focus on the simpler case of the two—namely, when there is one nurse. Also, assume that patients arrive in a Poisson fashion and the service rate of the nurse is exponentially distributed. During this slower period, patients arrive with an interarrival time of approximately 4 minutes. It takes the nurse an average of 3.60 minutes to prepare the patients’ serum and administer the injection.
a. What is the average number of patients you would expect to see in Dr. Martin's facilities? (Do not round intermediate calculations. Round your answer to 2 decimal places.)
Average number of patients:
b. How long would it take for a patient to arrive, get an injection, and leave? (Round your answer to 2 decimal places.)
Average total time in minutes:
c. What is the probability that there will be three or more patients on the premises? (Do not round intermediate calculations. Round your answer to 1 decimal place.)
Probability:
d. What is the utilization of the nurse? (Do not round intermediate calculations. Round your answer to 1 decimal place.)
Utilization of the nurse in %:
e. Assume three nurses are available. Each takes an average of 4.00 minutes to prepare the patients' serum and administer the injection. What is the average total time of a patient in the system? (Do not round intermediate calculations. Round your answer to 2 decimal places.)
Average total time in minutes:
What does trending mean on twitter
: Twitter has become a very popular personal, as well as business social networking site. Write a one (1) page paper (about 2-4 paragraphs), that summarizes five ways that a business can use Twitter in order to increase its revenue. What does “trending..
|
Calculate the percentage utilization of the operator
: An office employs several clerks who originate documents and one operator who enters the document information in a computer system. The group originates documents at a rate of 19 per hour. Calculate the percentage utilization of the operator. Calcula..
|
Teams are everywhere in society
: Teams are everywhere in society. Discuss specific successful teams that you have seen or experienced.
|
What is the average waiting line length
: Burrito King (a new fast-food franchise opening up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 40 seconds to produce a batch of burritos. What is the a..
|
Excellent system for handling his regular patients
: L. Winston Martin (an allergist) has an excellent system for handling his regular patients who come in just for allergy injections. Patients arrive for an injection and fill out a name slip, which is then placed in an open slot that passes into anoth..
|
What average number of people in line can be expected
: To support National Heart Week, the Heart Association plans to install a free blood pressure testing booth in El Con Mall for the week. Previous experience indicates that, on average, 6 persons per hour request a test. What average number of people i..
|
What is your philosophy of education
: What is your philosophy of education ( Perennialism / Essentialism / Progressivism/ Extistentialism / Social Reconstructivism ). Cite the relevant philosophers and ideas discussed in the text book.
|
Discuss the two pics for the artist marycassatt shown
: The artist MARRY CASSATTE: discuss the two pics for the artist marycassatt shown in figure 1+2, the n campare the figure 2 with figure 3 for the artist edgar degas.
|
What is the project npv if the discount rate is given
: A proposed nuclear power plant will cost $2.3 bill... A proposed nuclear power plant will cost $2.3 billion to build (today) and then will produce cash flows of $310 million a year for 5 years (year 1 to year 5). It then must be decommissioned at ..
|