Evaluate the preconsolidation pressure

Assignment Help Civil Engineering
Reference no: EM131191543

For the test data of Problem 8-12, construct the field virgin compres-sion curve using the Schmertmann procedure for an OCR of unity.

Problem 8-12

The following consolidation test data were obtained from undisturbed San Francisco Bay Mud. For this clay, LL = 88, PL - 43, p, = 2.70 Mg/m3, and w,, = 105.7%. Initially, the specimen height was 2.54 cm and its volume was 75.14 cm;. Plot the data as percent consolidation versus log pressure. Evaluate the preconsolidation pressure and the modified virgin compression index.

Reference no: EM131191543

Questions Cloud

Compute the depth of an excavation to cause a reduction : Given the data of Example 8.22. Instead of a load on the surface, compute the depth of an excavation to cause a reduction in stress at the bottom of the excavation of 250 kPa if p - 2 Mg/m3. The excavation plan area is shown in Fig. Ex. 8.22a.
What would you do first if you were gerald neumeier : What would you do first if you were Gerald Neumeier?-  Did Ms. Grayson deserve the credit she claimed for the favorable variances? Explain.
Estimate the compression and recompression indices : estimate the compression and recompression indices and both modified in-dices for as many of the clays of Fig. 8.8 as you can. How well do the empirical relationships agree with the laboratory data? 8-30. Do Problem
Ensure effective and reliable forecasting : To ensure effective and reliable forecasting, the following aspects must be considered External factors, contractual obligations, internal control and,ethical business practices.
Evaluate the preconsolidation pressure : Evaluate the preconsolidation pressure and the modified virgin compression index.
What factor may have tipped off the investor group : What factor may have tipped off the investor group that something was wrong? In what way would those investors have been harmed? If Allen had attracted enough equity capital, do you think he would have been able to conceal the scheme?
Evaluate any damaging financial repercussions of failure : Evaluate any damaging financial and ethical repercussions of failure to include the inventory write-downs in the financial statements.
Equilibrium price and quantity : Suppose the demand curve is: P = 200 - 2QDand the supply curve is: P = 100 + 3QS. What is producer surplus in the market at the equilibrium price and quantity?
Compute the settlement due to an additional stress : The consolidation curve of Fig. Ex. 8.9 is typical of a compressible layer 5 m thick. If the existing overburden pressure is 50 kPa, compute the settlement due to an additional stress of 150 kPa added by a structure.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find his acceleration

The 180-lb man in the bosun's chair exerts a pull of 50 lb on the rope for a short interval. Find his acceleration. Neglect the mass of the chair, rope, and pulleys.

  Determine the load carried by the rod in supporting the beam

The beam is rigidly attached to a fixed wall at end B. with end D being supported by a rod of length L, Young's modulus E and crosssectional area A. A line load and a couple act on the beam. as shown. Using Castigliano's method. determine the load..

  What is meant by the base value in an arithmetic gradient

1. What is meant by the "base value" in an arithmetic gradient 2. Which two alternative comparison techniques requier equal service lives Why

  What aspects of cutting off the tops of the shoring piles

What aspect(s) of cutting off the tops of the shoring piles (digging, torching, or backfilling) is a potential cause of damage to the below-grade waterproofing membrane?

  What do they estimate thhe acceleration due to gravity to be

In an experiment to estimate the acceleration due to gravity,a student drops a ball at a distance of 1m above the floor. His labpartner measures the time it takes to fall and obtains an estimateof 0.46s.

  Consider a computer without priority interrupt hardware

Explain how a priority can be established in the interrupt service program.

  Bernoulli equation-measure the flow rate through the meter

The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.

  Find dissolved oxygen deficit just downstream from outfall

A POTW (a.k.a. waste water plant) 1.0 m^3/s of treated effluent having an ultimate BOD of 30mg/L and DO = 2 mg/L into a stream that has a flow of 8 m^3/s, a BOD = 5.0 mg/L and DO = 9 mg/L.

  A ferric chloride dosage of 40 mg/l and an equivalent dosage

A ferric chloride dosage of 40 mg/l and an equivalent dosage of lime are used to coagulate a water.

  What does it mean to overproduce or under produce a product

What does it mean to overproduce or under produce a product?

  Determine the gross water supply reservoir volume

Determine the gross water supply reservoir volume for the following information: City population: 200,000 Water consumption rate: 568 Lpcd Catchment area: 103 Km^2 Rainfall rate: 110cm/yr Annual soil evaporation: 50cm Minimum net reservoir volume:..

  Determine the angle of twist of gears a and c

The 60mm diameter shaft ABC is supported by two journal bearings, while the 80mm diameter shaft EH is fixed at E and supported by a journal bearing at H. If T1= 2 kN*m and T2= 4 kN*m

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd