Evaluate acquiring new micrometers for gauging diameters

Assignment Help Supply Chain Management
Reference no: EM131564706

Problem Statement: Too many rejects and high scrap rate

Project Goals: Reduce scrap

Defect Definition: Under/over size diameter

Improvement Actions: 1. Changes implemented

( List the improvement Actions here/ changes implemented)

Project Savings: Scrap cost savings (quantity)

2. Follow up Plan to Sustain the Gains:

Control steps for sustainability

(List the control steps to sustainability here)

Background

A value stream mapping team was put together to map and benchmark the current state of our grinding cell. This team was comprised of the cells supervisor, its two full time operators, a quality inspector, and our Six Sigma team. Through the mapping activity and subsequent brainstorming sessions the team the made these noteworthy observations with respect to areas of possible improvement:
That maintenance currently performed on our two grinding machines largely leaves many fundamental concerns and problems unresolved. That our internal maintenance staff lacks the support and expertise to properly maintain these machines. That previously contracted maintenance support which was available when the machines were originally acquired is no longer available.

That improving our gauging and indexing capabilities (i.e., the ability to precisely gauge shaft diameters as well having the ability to precisely know its positional relationship to grinding wheel throughout the grinding process) could bring about improvements in our ability to consistently grind within our given tolerance ranges and improve output.

That acquiring a third machine and dedicating it to grinding our line requirements could reduce the amount of set-up time currently required for changeover and thereby increase the cells overall output as well as having the potential to reduce set-up related errors.
That a better grade grinding wheel than is currently being used might be available, that a different abrasive might help in increasing the grinding accuracy and overall output.

Document information found only in the charter:

An explanation of why the project is being done

A statement of the goal and desired results in measurable terms

Project plan and milestones

Roles and responsibilities

Date charter was reviewed

Who approved the charter

Define:

Put problem statement here and remove bullets below.

A detailed description of the problem that anyone can understand after having read the "Background" and "Definitions" slides.

Problem description should be from customer's point of view

It should be as specific as possible.

It should NOT contain root causes or solutions.

Problem statements do not include the words "implement", "install", etc. If the team already knows what the solution is, this is not a Green Belt project.

Describe the negative things the customers experience and how this impacts them. Keep it high level.

As measurements are taken and as the scope narrows, update this problem statement with the new information. By project end, this problem statement will tell what problems occurred, how often, where, who was affected, etc. BEFORE the improvement was made!

Action items:

Evaluate acquiring new micrometers for gauging diameters.

Evaluate acquiring alternate methods for gauging diameters, suchas air and laser gauging.

Look into after market machine indexing packages that can automate diameter gauging, machine indexing, and give us the capability of automatic wheel dressing compensation, such a Marpossor similar type system. (www.marposs.com)

Look into acquiring new machines with modern control mechanisms.

Evaluate theses options from both a cost and time savings perspective.

Basically our shafts require four different grinding operations, three outside diameter grinds and one face grind. The face grind requires a different grinding wheel than that used to grind the outside diameters. Changing over and setting up for this grind can take up to eighty minutes. Acquiring a third grinding machine and dedicating it to the face grinding could reduce change over and set-up times and increase available grinding time and therefore our output.

Action item:

Evaluate this option from both a cost and time savings perspective.

Grinding whels come in many different abrasive forms; some may be better suited to our needs than those that are currently being used. If an abrasive can found that would yield better results than those now achieved it terms of the numbers of wheel dressings required, the speed at which material can be removed, and improve repeatability in terms of being able to hold size then some improvement could be realized.

Action items:
Contact various grinding wheel manufactures and or sales representatives and explore the different abrasive options available.
Purchase the best choice and compare its performance against what is currently being used.

Improve:
Implementation Planning: Measure shaft diameters ground with new wheel using original measurement plan (data sheet)

Identify the following:
What type of data will be collected.
Attribute Data - qualitative (yes/no, pass/fail, damage/no damage)
Variable Data - quantitative (time, dimensions, percentages)
Why the data is needed.
Where the data will be collected.
How the data will be collected (method).
When the data will be collected (frequency).
Who will collect the data.

Select Solutions: Use different wheel to reduce frequency of wheel dressing

Conclusion statements
Put the define state( telling what you did in the entire project and the actions implemented
The conclusion statements should be on the very last slide, it show explain in clear terms

Control:

The Project Team identifies ways to "mistake-proof" the process improvement.
automate diameter gauging and machine indexing,
Improve the frequency of data collection and capability to compensate for wheel dressing

Attachment:- six sigma.rar

Verified Expert

The project is about the grinding machines tool. it is basically used to grind the big parts into the small pieces. there are many types of grinding tools even to grind steel. in this project, we face the problems like over sized and under size of the diameter of grinding tool. how to manage this to overcome these difficulties.

Reference no: EM131564706

Questions Cloud

Examine how employment law affects ethical leadership : Evaluate the ethical issues that pertain to the event(s) within the scenario.Examine how employment law affects ethical leadership.
What will his gross income be after the cola takes effect : Jamal currently earns $20,000 a year in gross wages. On January 1, he is due to receive a 2% COLA.
How you would balance the needs of sparksvilles environment : Describe how you would balance the needs of Sparksville's environment and economy. Explain your reasoning.
Find the total raw materials variance : The budgeted amount of material usage for the year was computed as follows. The raw material price variance for the year was
Evaluate acquiring new micrometers for gauging diameters : Evaluate acquiring new micrometers for gauging diameters - Describe the negative things the customers experience and how this impacts them. Keep it high level.
Discuss any biases you identify in the literature review : Discuss any biases and limitations you identify in the literature review. Does the author present these biases and limitations
Create an outline and state which of five leadership styles : Create an outline and state which of five leadership styles (transformational, transactional, laissez-fair, autocratic) best defines your leadership style.
How might your study contribute to the scholarly literature : How might your study contribute to the scholarly literature? How would your study develop original knowledge that adds to or could revolutionize study.
Determine the manufacturer finished goods inventory value : Using the full absorption costing method, Determine the manufacturer's finished goods inventory value

Reviews

len1564706

7/14/2017 7:33:30 AM

The assignment is attached, The Highlighted areas in yellow is the question that need to be answer. Please take your time to read it and follow the guideline listed in those yellow, under each question and provide answer. Note : Please Do Not send this work in a word document. I want it back in power-point just as it is now in the attachment.

Write a Review

Supply Chain Management Questions & Answers

  Supply-chain challenges in post-earthquake japan

Explain the advantages and disadvantages of the supply chain used in the Japanese auto industry before the March 11 earthquake and tsunami.

  Strategies that enable the company to become successful

Analysing the issues in the case, and identify logistics management strategies that enable the company to become successful, and/or will be necessary for the company to maintain/improve its success in the future.

  Explain the overall goal of a supply chain

Explain the overall goal of a supply chain. Describe the difference between a supply that is responsive (service) and a supply chain that is efficient.

  Describe technology applications in supply chain management

Describe Technology applications in supply chain management

  Aggregate planning for a bottling company

Which production strategy should the production managers choose based on a total cost minimisation objective and what information about this aggregate plan should be shared with various supply chain partners and why?

  What are the advantages of each of dardens four supply chain

What are the advantages of each of Darden's four supply chains?

  How does implementation of supply chain management result

In this week's discussion focus on the benefits of supply chain management, how does the implementation of supply chain management result in enhanced customer value?

  Compute the monthly production and ending inventory

Compute the MSE, the MAD, the MAPE, the RSFE and the tracking signal for each forecasting method. Which method is better - Compute the monthly production and ending inventory

  Language differences, government regulations, cultural diff.

Language differences, government regulations, cultural differences pose great ch allenges and risks to global sourcing. The benefits of global sourcing overshadow the risks:

  Determine the forecast for each sku using method

Determine the forecast for each SKU using Method 1, 2 and 3. Then, assume the season is over, and your actual demand is given in the sheet "realized demand". Determine:

  Determine the two departmental cost driver rates

ENG 3006 Integrated Logistics Support (ILS) Management. The Gonzalez Company uses a job order costing system at its plant in Green Bay, Wisconsin. Determine the two departmental cost driver rates

  How has evolution to e-business affected business services

How has the evolution to e-business affected business services? How has the Internet supported the growth and opportunity of e-business

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd