Back in 1957, the year in which the Project Evaluation and Review Technique (PERT) was developed by the US Navy, statisticians developed a simple technique to estimate the amount of time it might take to carry out a task. To use the technique, all one needs is to be able to estimate three parameters: a = the best case duration (fastest), b = the most typical case (mode), and c = the worst case duration (slowest). Given these three parameters, estimators can employ the following formula to estimate the expected amount of time it takes to do a job:
Expected time = e(t) = (a + 4b + c)/6
The expected value of time calculated by using this formula turns out to be roughly the mean value of a PERT-Beta distribution:
The standard deviation (SD) for this estimate is roughly (c – a)/6. The standard deviation tells us that the true value of an estimate lies within the range of +/- 1 SD roughly 60-70% of the time. For example, if we usethe PERT-Beta distribution to determine that the expected value of task duration is 4.33 days and the standard deviation is 0.67 days, we can say: “Roughly 60-70% of the time, the actual task duration lies in the range of 4.33 days +/- 0.67 days.”
Note that while this approach to estimating values was originally employed in estimating durations, it can be also used to estimate costs and number of resources required to do a job.
Questions:
Company records show that the time taken to install a piece of equipment at customer facilities as follows:
What is the expected time for the installation effort?
What is the standard deviation associated with the installation effort?
What is a practical interpretation for the results reported in 1a and 1b above?
Conduct research into the cultural characteristics
: Conduct research into the cultural characteristics that you believe should be important considerations in establishing a core compensation program for a U.S. company that plans to locate there.
|
What are some barriers and limitations
: As we look at the types of providers in the health care industry, what are some barriers and limitations to how patients transition from one level of care to another?
|
When participating in international buying negotiations
: When participating in international buying/selling negotiations, a sole sales negotiator is at a disadvantage when faced with a small team of buyers. Explain whether you agree with this statement and explain why or why not.
|
Lower production costs and increase productivity improving
: Briefly explain how a company can achieve lower production costs and increase productivity by improving the quality of its products and services?
|
Estimating with the pert-beta distribution
: Back in 1957, the year in which the Project Evaluation and Review Technique (PERT) was developed by the US Navy, statisticians developed a simple technique to estimate the amount of time it might take to carry out a task. What is the expected time fo..
|
Which intelligence collection techniques do you feel
: Which Intelligence Collection techniques do you feel have been used to greatest effect in accomplishing the US objectives in the past wars in Iraq and Afghanistan?
|
Applying for a general small-business loan
: From the e-Activity, imagine you are applying for a general small-business loan from the SBA in order to open a new pub in your neighborhood, and your projected annual revenue is $350K.
|
Use shadow prices from solver sensitivity report
: The Otto Maddick Machine Tool Company produces two products, muffler bearings and torque amplifiers. One muffler bearing requires 0.125 hr. of assembly labor, 0.25 hrs. in the stamping department and 9 square feet of sheet metal. Use shadow prices fr..
|
Sequential product development process
: What steps in the sequential product development process are similar to the concurrent product development process? What steps are different?
|