Part 1
You work as an estimator for a home improvement contractor. Part of the bid that you are preparing includes a bid to build a fancy deck 10 ft. x 30 ft. for a homeowner. The deck will be over a steeply sloping back yard which requires extra bracing for the posts and a long stairway. Your carpentry estimator used a Parametric estimate of $24.00 per sf. ft. He adjusted it upward by 10% for the difficulty. Are you comfortable with his estimate? How would you check it?
Part 2
Estimating
1. Compare 3 estimating techniques: Analogous, Bottom-up and Parametric. Explain the circumstances which determine the method you should use each type as your primary method.
2. According to PMI (2017, p. 245) There are two common ways to estimate cost and duration using the 3-point method. The first is the triangular distribution where the estimate is based on the average of the optimistic (O), most likely (M), and pessimistic (P) estimates. Mathematically, Your estimate = (O+M+P)/3. The second way is based on the Beta distribution that puts more weight on the most likely. Mathematically, your beta estimate = (O+4M+P)/6. Using the following, calculate the two estimates of duration: O=4; M=6; P=11. Explain the difference in the answers. How would you decide which method to use?
Create a project schedule and align resources, Analyze project schedule and resource allocation
Write a report on Managerial Roles and Gap Analysis
Questionaire on Project Management
Describe the market growth rate for product and service.
Design an online system for the human resources department to manage available job positions.
How does a project risk management approach pro-vide an early warning signal for impending problems or issues
Calculate the payoff and the profits for investments
Describe the features or characteristics of your product or service.
Write paper on Inventory Management System.
Analysis of the overall project risk
Evaluate the usefulness of ROCE
Distribution strategy and project management
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd