You work as an estimator for a home improvement contractor. Part of the bid that you are preparing includes a bid to build a fancy deck 10 ft. x 30 ft. for a homeowner. The deck will be over a steeply sloping back yard which requires extra bracing for the posts and a long stairway. Your carpentry estimator used a Parametric estimate of $24.00 per sf. ft. He adjusted it upward by 10% for the difficulty. Are you comfortable with his estimate? How would you check it?

Part 2

Estimating

1. Compare 3 estimating techniques: Analogous, Bottom-up and Parametric. Explain the circumstances which determine the method you should use each type as your primary method.

2. According to PMI (2017, p. 245) There are two common ways to estimate cost and duration using the 3-point method. The first is the triangular distribution where the estimate is based on the average of the optimistic (O), most likely (M), and pessimistic (P) estimates. Mathematically, Your estimate = (O+M+P)/3. The second way is based on the Beta distribution that puts more weight on the most likely. Mathematically, your beta estimate = (O+4M+P)/6. Using the following, calculate the two estimates of duration: O=4; M=6; P=11. Explain the difference in the answers. How would you decide which method to use?

Reference no: EM133525351

Questions Cloud

Explains standards for disaster recovery : Explains standards for disaster recovery and emergency management policies and procedures. Assesses methods of data standards and data management.
Examples of a business intelligence strategy : What are some examples of a business intelligence (BI) strategy that people might have experienced especially educators?
Some are calling for medicare for all : Some are calling for "Medicare for all" and there is no longer a place in the market for private insurance companies (managed care).
Regarding the organization capital campaign : What level of involvement is expected from your organization's board members regarding the organization's capital campaign?
Estimating techniques-analogous-bottom-up and parametric : Compare 3 estimating techniques: Analogous, Bottom-up and Parametric.
Five garments from wardrobe : Choose five garments from wardrobe. Identify the fiber content of each and discuss why you think the designer/merchandiser choose those specific fibers.
Explain the delivery process for each methodology : Explain the delivery process for each methodology. Compare the selected methodologies, referencing practical use in today's environment.
Snow blower dispute-equipment plus vs parts warehouse : Is there a breach of contract and if so what type of breach? What are the liquidated damages if any? Define liquidated damages.
Entering into the provisional sums schedule : An appropriate rate per metre for boring and pouring of the piers, for entering into the provisional sums schedule.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd