It's a bad day in Tampa! A tornado {we had enough hurricanes!!} hits Tampa and destroys the substation that supplies the USF campus. The 69 kV subtransmission line that loops through the substation was left undamaged, and will be used to supply the new substation which needs to be built to replace the destroyed one. At the same time as the tornado was destroying the substation, a massive swarm of PVC-eating subterranean termites ate through virtually all of the underground primary cable serving the campus. {I told you it was a bad day!!} And to make things worse, nobody can seem to find the engineering drawings that show how the primary circuits were designed. {See, those AutoCAD files really do need to be backed up!!}

Only a brilliant engineering student (that would be you) can save the day by designing a new substation and distribution primary system. So here's your task:

Phase 1: Substation

A 69 kV source configuration needs to be designed. When doing this, keep in mind what is existing and the reliability requirements of the campus and several hospitals served by the substation.

Two transformers (36 MVA each) are needed in the substation to step the voltage down to 13.2 kV. Three circuits must leave the substation (one heading west on Fletcher Ave., one heading east on Fletcher, and one heading north on 42nd St - across from Palm Ave.) to serve non-USF load. Those circuits are overhead on concrete poles, so were unaffected by the termites. You just need to provide breakers to supply these existing feeders. Additional underground circuits will need to be built to supply the USF campus.

Phase 2: Distribution Primary

Today, the USF campus has a peak load of 35 MW. The load forecast for the USF campus was also misplaced - probably with the feeder drawings... So a new load forecast needs to be developed. Somebody seems to remember an ultimate peak load for 42 MW for the whole USF campus many years in the future, so use that number and informal load forecasting methods to re-create the campus load forecast for a 10-year period. The number of feeders you choose to use, and the amount of load served by each feeder is up to you. Remember to be able to provide a backup source if a main source becomes unavailable. Propose a primary feeder layout using the map on the last page of this project description. The red square top and center of the map is the substation location. The red line running along Fletcher Ave. is the 69 kV subtransmission line.

Deliverables:

All students do these

Produce a one-line diagram of the substation you propose. Show as much detail as you think is necessary in a preliminary (planning) document. Clearly show how the 69 kV source is configured and the bus topology that you believe is most appropriate to use.

On the attached campus map, show the routing of the primary feeders. Estimate the size of the service transformers based on transformer sizes you see in the engineering portion of the campus. Each service transformer on campus has its kVA rating clearly shown by stickon labels displayed on the steel enclosure.

Show your load forecast for at least a 10-year period. Keep in mind vacant land when doing the forecast.

Provide calculations showing feeder loading and estimate what you believe is a reasonable load factor. Suggest some demand-side management techniques to improve the load factor.

Explain how the new system will be operated in the event of a subtransmission line or substation transformer failure. Also discuss breaker failure scenarios.

Students taking this course for graduate credit (or undergraduates seeking extra credit) do these in addition Add sectionalizing devices on the primary circuits as you see fit. Suggest researching "PMH switchgear" by S&C Electric Co. for the available hardware. Note which type (circuit configuration) of PMH switchgear you select on your feeder drawing.

Determine the size (in kcmil) and type (copper or aluminum) of underground cable to use for your primary circuits. Suggest researching the Okonite Company website for cable data.

Propose an expansion strategy if the USF campus grows faster than the load forecast suggests. This should address both the substation and the primary system.

Attachment:- Assignment File.rar

Reference no: EM131745395

Questions Cloud

Methods for managing conflict among virtual team members : Identify and discuss the trends and methods for Managing Conflict Among Virtual Team Members
Compute the number of steps on apartment fire escapes : Univariate Data Classifications A set of observations is obtained as indicated below. In each case, classify the resulting data set as categorical or numerical.
Define the u.s. economy would grow more rapidly : In early 2013, economists predicted that the U.S. economy would grow more rapidly than had been predicted
Determine that given statement is discrete or continuous : Univariate Data Classifications A set of observations is obtained as indicated below. In each case, classify the resulting data set as categorical or numerical.
Estimate what you believe is a reasonable load factor : EEL 4214/6936 Utility Distribution Systems Design Project. Provide calculations showing feeder loading and estimate what you believe is a reasonable load factor
What are three soft skills great leaders incorporate : What are Three soft skills great leaders incorporate and how do each of them effect employees
Describe your experiences with tutoring individual student : Describe your experiences with tutoring your individual student at Ferguson-Easley Elementary School.
Write about important concepts such as sex and gender roles. : So I will be focusing on three important things. The first thing is about important concepts such as gender, sex, orientation and gender roles.
Find the number of black squares in crossword puzzles : Numerical Observations A set of numerical observations is obtained as described below. Classify each resulting data set as discrete or continuous.

Reviews

len1745395

12/1/2017 12:13:30 AM

Subject: Electrical Engineering – Power. Ignore the direction for graduate students as that doesn't apply to me. Only a brilliant engineering student (that would be you) can save the day by designing a new substation and distribution primary system. Propose an expansion strategy if the USF campus grows faster than the load forecast suggests. This should address both the substation and the primary system.

Write a Review

Electrical Engineering Questions & Answers

  Find the electric field strength between the plates

A 4- µF parallel plate capacitor has 160 µC of charge on its plates. If the plates are 5 mm apart, find the electric field strength between the plates.

  Identify three types of electrical or electronic components

Identify three types of electrical or electronic components currently used in business or industry today that use voltage regulators in their operation. Discuss some of the problems that can be experienced if the input voltage to the electroni..

  Find v-high to obtain twice rated current

John's house is served electrically by a single phase transformer rated 15 kVA, 8160 / 220 V, 60 Hz. The leakage reactance of the transformer is 400 ohms referred to the high side. John wants to replicate an interesting EEE 360 experiment

  Fnd the percentage of tapping of the autotransformer

A squirrel-cage induction motor has a fullload slip of 4% and a blocked-rotor current of six times the full-load current. Find the percentage of tapping of the autotransformer starter to give full-load torque on starting and the line current as a ..

  Assume both antennas are ideal.

Assume both antennas are ideal.

  Devise a way to address words of memory using fewer n pins

As more and more memory is squeezed onto a single chip, the numberof pins needed to address it also increases. It is often inconvenient to have large numbers of address pins on a chip. Devise a way to address 2^n words of memory using fewer than n..

  Why designer often use signal conditioning amplifier circuit

What are two types of variables that can be used for values that exceed 256, and describe what is the difference between the variables, how to declare them and the memory allocated, and the numerical range for both.

  Explain the operation of the circuit

Refer to the circuit shown in Figure 32-7. Assume that timer TR is set for a delay of 10 seconds. Now assume that timer TR is changed from an off-delay timer to an on-delay timer. Explain the operation of the circuit.

  Find out how to use the solve function to solve for va

To analyze electric circuits, it is often necessary to solve simultaneous equations. To find the voltages Va, Vb, and Vc at nodes a, b, and c, the equations are 2(Va-Vb) + 5(Va-Vc) - e^(-t) =0 2(Vb-Vc) + 2Vb + 3(Vb-Vc) =0

  Which firm''s product provides the greatest value-created

Two firms, Alpha and Beta, are competing in a market in which consumer preferences are identical. Alpha offers a product whose benefit B is equal to $75 per unit. Alpha's average cost C is equal to $60 per unit, while Beta's average cost is equal ..

  A single-turn square loop of wire 200 cm on each edge

a single-turn square loop of wire 2.00 cm on each edge carries a clockwise current of 0.200 a. the loop is inside a

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd