estimate the total cost and cost per linear foot for furnushing and driving steel-sheet piling for construction of the basement of a building, 150 by 240 ft. the piles will be 22 in. wide, 18 ft. long, and weigh 40.3 Ib/Lin ft. the piles will be driven in pairs to full penetration into soil having normal frictional resistance.

Reference no: EM13320438

Questions Cloud

Determine the initial valuation : Determine the initial valuation of each asset, assuming that immediately after acquisition, Semtech demolished the building. Demolition costs were $260,000 and the salvaged materials were sold for $6,500.
Globe integration and related implication : The discussion is talking about the globe integration and related implication - subject is management of strategic operation
The revenue and cost for a manufacturing company : The revenue and cost for a manufacturing company is:
What are the three longest wavelengths : A film of MgF2 (n = 1.38) having thickness 1.68 10-5 cm is used to coat a camera lens, What are the three longest wavelengths that are intensified in the reflected light
Estimate total cost and cost per linear foot for furnushing : estimate the total cost and cost per linear foot for furnushing and driving steel-sheet piling for construction of the basement of a building, 150 by 240 ft. the piles will be 22 in. wide, 18 ft. long, and weigh 40.3 Ib/Lin ft.
Which of the following should be deducted from net income : Which of the following should be deducted from net income in calculating net cash flow from operating activities using the indirect method? a. dividends declared and paid b. a loss on the sale of equipment c. depreciation expense d. gain on sale ..
The balanced chemical equation carbon dioxide and water : What is the balanced chemical equation for the complete combustion of benzoic acid, C6H5CO2H, to form carbon dioxide and water
What is the unit sales price : Jetson Co. sold 20,000 units of its only product and incurred a $50,000 loss (ignoring taxes) for the current year as shown here. During a planning session for year 2012 activities.
Evaluate the heat transfer per unit mass and work per unit : A quality of water within a piston-cylinder assembly executes a Carnot power cycle. During isothermal expansion, the water is heated from saturated liquid at 50 bar until it is a saturated vapor.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Circular and non-circular slip surfaces

The thickness of each layer is determined by the "last" ID number. Four student numbers are used as the example - Circular and non-circular slip surfaces should be considered

  Determine the maximum number of large trucks and buses

The traffic stream consists of cars, buses, and large trucks (no recreational vechicles). A weekday directional peak-hour volume of 1800 vehicles (familar users) is observed, with 700 arriving in the most congested 15 min period.

  Calculate the initial head loss through a dual-media filter

The porosity of both media is 0.40, the shape factor for the anthracite is 7.5, and the shape factor for the sand is 6.0. Assume a water temperature of 60 F.

  What will it be at denver of the us standard atmosphere

If the takeoff speed of an airplane is 120 mph at sea level, what will it be at Denver (elevation =5000 ft) Use properties of the US Standard Atmosphere

  Determine how long it will take at minimum to fill an glass

The drinking water needs of an office are met by large water bottles. One end of a .25 in diameter plastic hose is inserted into the bottle placed on a high stand, while the other end with an on/off valve is maintained 2 ft below th bottom of the ..

  Compute the size of a squeare concrete box culvert to handle

Compute the size of a squeare concrete box culvert to handle a discharge of 25.5 cms. The culvert will have a length of 45.7m with a slope of 0.01 and a maximum headwater depth of 4.57m.

  Determine quantity of lime and soda ash required to soften

Determine the quantity of lime and soda ash required to soften 1 mgd of the following water. Plan to achieve a hardness of 40 mg/L as CaCO3. Note that an excess of 35 mg/L of lime (CaO) is required to achieve 40 mg/L as CaCO3.

  Problem on coefficient of rolling resistance

What is the minimum distance from the stalled car at which the driver could apply the brakes and still stop before hitting it? Assume coefficient of rolling resistance of 0.013.

  Determine what is the elevation of the pvt

The high point is at elevation 1011.4 ft. The initial grade is +2% and the final grade is -1%. What is the elevation of the PVT. Solve this problem with the parabolic equation rather than by using offsets.

  Explain how to compute a satisfactory curve length

at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction d..

  Oxidization of ammonia during nitirification

what is the final dissolved oxygen concentration (in mg/L) in the waste lagoon after all of the ammonium (NH4 + ) is converted to nitrate? Recall that 4.57 mg of O 2 is need per mg of ammonium (as N) oxidized during nitirification. After all of the..

  Determine the specific gravity on the sand by a vacuum pump

a cylinder has 500 cm3 of water. after a mass of 100 grams of sand is poured into the cylinder and all air bubbles are removoed by a vacuum pump, the water level rises to 537.5 cm3. Dteremine the specific gravity on the sand

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd