Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question: At a small rock quarry, a single power shovel dumps a scoop full of rocks at the loading area approxi-mately every 10 minutes, with the actual time between scoops modeled well as being exponentially distributed, with mean 10 minutes. Three scoops of rocks make a pile; whenever one pile of rocks is completed, the shovel starts a new pile. The quarry has a single tuck that can carry one pile (3 scoops) at a time. It takes approximately 27 minutes for a pile of rocks to be loaded into the truck and for the truck to be driven to the processing plant, unloaded, and return to the loading area. The actual time to do these things (altogether) is modeled well as being normally distributed, with mean 27 minutes and standard deviation 12 minutes. When the truck returns to the loading area, it will load and transport another pile if one is waiting to be loaded; otherwise, it stays idle until another pile is ready. For safety reasons, no loading of the truck occurs until a complete pile (all three scoops) is waiting. The quarry operates in this manner for an 8-hour day. We are interested in estimating the utilization of the trucks and the expected number of piles waiting to be transported if an additional truck is purchased.
Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.
This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.
This assignment has questions related to probabiltiy.
Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.
Derive the Boolean Expression and construct the switching circuit for the truth table stated
Evaluate which equations are under-identified, just-identified, and over-identified.
Linear programming problem consisting of only two constraints with one objective function.
Find the natural domain of the given functions.
Compute the coecients of the polynomials using the term recurrence relation.
De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.
Questions related on mathematics in computing.
Complex problems
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd