Estimate the total cost and cost per linear foot for furnush

Assignment Help Civil Engineering
Reference no: EM13545529

1.A well of radius 0.4 ft produces water from an unconfined aquifer with K = 12 ft/day. The well is located 850 ft from a large water body that acts as a constant head boundary. If the saturated thickness of the aquifer at the water body is 75 ft, what is the maximum production rate of the well?

2.Estimate the total cost and cost per linear foot for furnushing and driving steel-sheet piling for construction of the basement of a building, 150 by 240 ft. the piles will be 22 in. wide, 18 ft. long, and weigh 40.3 Ib/Lin ft. the piles will be driven in pairs to full penetration into soil having normal frictional resistance.

Reference no: EM13545529

Questions Cloud

Find the stress induced in the aluminum rod : Find the stress induced in the aluminum rod if, after the gap is closed, the two segments are welded together, and then a leftward force is applied of the same magnitude needed to close the gap. Assume the rod segments remain aligned during loading.
Design the pins so that the ledge can support doug : Assume the ledge has the dimensions shown and is attached to the building with a series of equally spaved pins around the circumference of the building.
Calculate the axial stress in each bar : The bottom bar is made up of an aluminum bar and a steel bar, each 10 in. long placed in the parallel configuration at 70 F. That is also heated to 300 F.
Plot the shear-force and bending-moment diagrams : Plot the shear-force and bending-moment diagrams for the beam and derive equations for the shear force V and the bending moment M for any location in the beam
Estimate the total cost and cost per linear foot for furnush : Estimate the total cost and cost per linear foot for furnushing and driving steel-sheet piling for construction of the basement of a building, 150 by 240 ft. the piles will be 22 in. wide, 18 ft. long, and weigh 40.3 Ib/Lin ft. the piles will be driv..
What is your speed in mph and ft/s need formulas : You are driving a car your metered fuel flow is 5.97x10^5 csf if at the speed you are driving you are getting 40mpg what is your speed in mph and ft/s need formulas.
Find the intersection. how do you find the system curve : Find the cooling load (in tons of refrigeration) for a room supplied with 10,000 CFM of 95 DB outside air with ratio of 105 gr/lb. The room is to be maintained at 78 DB and humidity ratio of 71.5 gr/lb. The room calculated sensible heat load is 108,0..
Find the single-pipe diameter equivalent to two : Now, knowing ?hp or hl in the 1000’ parallel section, find the single-pipe diameter equivalent to two 12” dia ones. Assume high Rh, so Fig 9.11 applies.
Is this close to the transmission capacity within the system : Say the availability of supply is 60% to, and through Tank “A”, and 40% supplying tank B. Is this close to the transmission capacity within the system to J and C? If not, what do you suggest?

Reviews

Write a Review

Civil Engineering Questions & Answers

  How much would the water table need to be lowered

The specific yield of an unconfined aquifer is Sy = 0.15. How much, on average, would the water table need to be lowered (in m) in an area of 2.5 km^2 to release 6.5 x 10^5 m^3 of water from storage in this aquifer

  Estimate the annual number of additional cancers per year

Why don't we assume that there is an unknown moment about B? It the solution it only shows a horizontal force at B. And is there a reason why the horizontal force at B is labeled By?

  What is the longest amount of time that particle can take

If the tank is 2 meters deep and the particle enters the tank at the surface of the water, what is the longest amount of time that the particle can take to settle, if it is to be removed

  What hydrodynamic model would you use for the system

Solar cookers can be used in less developed countries for cooking and also for thermal disinfection of water. To disinfect water, the water must be heated to about 35 Celsius for 5 hours. Of course, it takes time to raise the temperature of the wa..

  Determine what is the effluent concentration at the rate

A first order reaction occurs in a PFR at the rate of 2.1 hr^-1. The reactor volume is 1400L and flow is 15 gpm. If the influent concentration is 200 mg/L, then what is the effluent concentration

  Find the tension in the cable and the magnitude of net force

A box of mass M=500 kg hangs by a rope from a beam with dimensions a=2.0 m and b=3.0 m. The beam has mass m=85 kg. Find the tension T_c in the cable and the magnitude of the net force F exerted on the beam by the hinge.

  Determine the change in length and the change in diameter

The acrylic plastic rod is 200mm long and 15mm in diameter. If an axial load of 300N is applied to it, determine the change in its length and the change in its diameter. Ep = 2.70 GPa, Vp = 0.4.

  What will be degree of saturation of the compacted embanment

An earth embankment is compacted at water contect of 17% to a bulk density of 1.90 gm/cc.If the specific gravity of soil grains is 2.65, then what will be the degree of saturation of the compacted embankment

  What is the probability that if purchased car is better

An automobile that you are looking at purchasing has an advertised fuel mileage of 30 miles per gallon. You rent the car for a week and track your mileage to school and back home and get (miles/gallon)

  Calculate ct the total dissolved inorganic carbon

Suppose the gas above the soda in a bottle of a soft drink is pure CO2 at a pressure of 2 atm. a. Estimate the pH of the soda. b. Calculate CT, the total dissolved inorganic carbon.

  What flow rate do you need to reduce the risk by 95 percent

A new sponge iron factory has an annual capacity of 100,000 tons/year of Iron production. Benzopyrene is produced during this process at a rate of 0.00006% of Iron produced.

  Calculate the final pressure temperature when the nitrogen

Calculate the final pressure, temperature when the nitrogen isreduced to that volume. What is the modulus of elssticity at thebeginning and end of the compression. k=1.4

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd