Estimate the settlement of 10-ft and 5-ft square footings

Assignment Help Civil Engineering
Reference no: EM13300284

1. Footings for a structure are to be built beneath a basement slab on a clay soil at a depth of 20ft below present ground level. The groundwater table is 15 ft below the ground surface. The soil-void ratio is about 0.87. If the average bearing pressure on the footings is 2,600 psf, estimate the settlement of 10-ft and 5-ft square footings.

2. What is the factor of safety for the footings in Problem 1 against bearing failure if the clay soil has an unconfined compressive strength of 3,600 psf?

Reference no: EM13300284

Questions Cloud

Analyze the alternative and possibe consequence : Analyze the alternative and possibe consequence of each alternative .(note you should apply the capital budgeting decision tools and include the result as part of your discussion)
What is the maximum column load in kips that could be placed : What is the maximum column load in kips that could be placed on a 4-ft square temporary footing on a sand for which the standard resistance is about N=15 and the water table is at the surface
The sequence control structure : 1. the sequence control structure and the selection control structure?
What is the cost of common from retained earnings : Assume that Kish Inc. hired you as a consultant to help estimate its cost of common equity. You have obtained the following data: D0 = $0.90; P0 = $27.50; and g = 7.00% (constant). Based on the DCF approach, what is the cost of common from retaine..
Estimate the settlement of 10-ft and 5-ft square footings : Footings for a structure are to be built beneath a basement slab on a clay soil at a depth of 20ft below present ground level. The groundwater table is 15 ft below the ground surface. The soil-void ratio is about 0.87.
Calculate the radiation pressure on the mirror : A 25.5-mW laser beam of diameter 2.08 mm is reflected at normal incidence by a perfectly reflecting mirror. Calculate the radiation pressure on the mirror
Type of sport is factor in elite athletes resting heart rate : A study comparing the resting heart rate of four different types of elite athletes recruited: 10 cyclists, 10 triathletes, 10 soccer players, and 10 baseball players. The resting heart rate of each athlete was measured, and the following hypothesis w..
What force is required to stretch the spring by this amount : A load of 52.5 N attached to a spring hanging vertically stretches the spring 5.29 cm. What force is required to stretch the spring by this amount
What is the stress along the top edge and the bottom edge : A horizontal pre-stressing force of 500kN is applied to rectangler beam. the beam has a depth of 500mm and a width of 250mm. the force is applied at a distance of 80mm below the x-x axis.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Describe the basic principle of differential gns positioning

Describe the basic principle of differential GNSS positioning and the difference between real time differential GNSS and post processed differential GNSS.

  Largest principal stresses and maximum shear stress

The shaft diameter is 100 mm. Calculate the largest principal stresses and maximum shear stress that will occur in the shaft.

  Estimate shaft elongation in millimeters with applied force

A 4.00-cm-diameter, 0.80-m long rod of aluminum 7075-T6 is subjected to an axial tensile force with a factor of safety of 1.75. The yield stress and modulus of elasticity of aluminum 7075-T6 are 500. MPa and 210. GPa, respectively.

  Determine the couple m required to hold the system

the pin at B is attached to member ABC and can slide freely along the slot cut in the fixed plate. Neglecting the effect of friction, determine the couple M required to hold the system in equilibrium when.

  Formulate problem as an ip and find optimal solution

The Record-a-Song company has contracted with a rising star to record eight songs. The sizes in MB of the different songs are 8, 3, 5, 5, 9, 6, 7, and 12, respectively. Record-a-Song uses two CDs for recording. Each CD has a capacity of 30 MB.

  What authority does responsible party have to verify

Who is responsible for verifying that the construction of the building complies with the hurricane protection provisions of the building codes What authority does the responsible party have to verify such compliance

  Determine the downward deflection of the tray center

A tray rests on an extendible arm consisting of two steel tubes with two different outer diameters. The downward force at the tray center F0 = 1000 N. Determine the downward deflection of the tray center and the tilt angles of the tray about each ..

  Determine the flow regime sub or super- critical downstream

determine the rate of discharge through the gate; b) determine the critical depth , yc at the minimum energy, Es,min; c) determine the critical depth, yc at the current flow; d) determine the alternate depth; e) determine the flow regime (sub- or ..

  Determine the pressure required to fill the container

If intake1=0m and intake2=0.5m, find the pressure required to fill the container when h=0.75m at both point 1 and 2. Assume the air is at atmospheric pressure until the water level passes intake 2 and the air follows isothermal compression.

  Determine was the pavement wet or dry

The driver of a car traveling up a 2% grade at an initial speed Vo applied the brakes abruptly and the vehicles slid to a complete stop at an average deceleration of 8 ft/s^2. Was the pavement wet or dry

  Find the resulting stress in the steel pipe material

A steel pipe carries an industrial oil under pressure. The steel pipe inside diameter is 36 in, the pressure head on the fluid is 383.0 ft. A)- Find the internal fluid pressure in psi

  Calculate pressure that is eventually reached in the tank

an insulated tank contains pressurized air at 2000 kPa and 30 degrees celcius. The air is allowed to escape to the atmosphere (P=95 kPa, T=30 degrees celcius) until flow ceases. Determine the final temperature in the tank.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd