Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A drinking water treatment plant will be designed to process a flow of 15,000 m3/d. The sedimentation tank will have a residence (detention) time of 4 hours and the overflow rate (Q/A) of 16 m3/m2-day. Estimate the required surface area (A), and the diameter and the depth of the tank.
two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa. what length L of splice plate is needed if the axial load carried by the joint is 55 kN and the width (W) is 315 m..
Determine the magnitude and direction of the force P in so that the resultant of P and the 900N force is a vertical force of 2700N directed downward using.
Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..
Three days later, Abu sees his solicitors and executed the transfer of his said bungalow to Abdul Samad at the said value. Two month later, Abdul Samad expelled Abu from the religious group. Abu now wants to set aside the sale of his bungalow.
How would you define the coefficient of permeability? Give typical values of the coefficient for: a) fresh cement pastes; b) hardened cement pastes; c) commonly used aggregates;
In my english class i have to write a propasl, and i choose to write a proposal on the libray doors at my school. the doors are very difficult to open even for young people like my self. who should i contact
the weigt w causes atension of 100 lb ic cable cd. if d=2ft, what is the moment about the z axis due to the force eserted by he cable cd at point c.
Set up a table showing curve elevations at the PVC, at the PVT, and at the half-station points along the curve. Compute the station and elevation of the curve turning point.
The flow out of a reservoir is 2 L/s. The reservoir surface is 5 m x 5 m. How fast is the reservoir surface dropping?
At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..
consider the cantilever beam-mass system. formulate and solve the minimum weight design.
What superelevation rate would you recommend for a roadway with a design speed of 100 km/hr and a radius of curvature of 500 m? Assume f = 0.11.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd