Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Water at 20ºC flows at a velocity of 2 m/s in a 200-mm diameter horizontal ductile-iron pipe. a) Estimate the friction factor in the pipe, and state whether the pipe is hydraulically smooth or rough. b) Compare the friction factors derived from the Moody diagram, the Colebrook equation, and the Swamee-Jain equation. c) Estimate the pressure change over 80 m of pipeline. How would the friction factor and pressure change be affected if the pipe were not horizontal but 1 m lower at the downstream end?
A 30-ft-high, 1-ft-diameter pipe is welded to the top of a cubic container 13 ft * 3 ft * 3 ft2. The container and pipe are filled with water at 20°C. Determine the weight of the water and the pressure forces on the bottom and sides of the contain..
Assume that there were 1,100,000 vehicles making a 28.5-mi round trip per day, the average vehicle emission rate for VOCs is 1.3 g/VM , and the molecular weight of the VOC emissions from the mobile sources can still be represented by that of metha..
Design a riveted end plated Connection between a beam ISHB-300 and the flange of the Column ISHB-200 to transfer a vertical factored shear of 125 kN and a factored hogging bending moment of 125kNm.Use Shop rivets of 20mm dia.
Each week 85 trucks bring a total of 2,180 metric tons of municipal solid waste (MSW) to the landfill. Each truck averages two loads per day. Each truck has a capacity of 4.5 metric tons and they operate 5 days/week.
The fixture AC is designed with a screw adjustment to regulate the height of the 900 N load supported by the roller at A. The screw bears against a smooth surface at B. Determine the reaction forces at points B and C. Neglect the weight of the fix..
An industrial building has floor area of 5 m by 8 m and is 3 m high with a door 1 m wide and 2 m high. Leakage of transformer oil from a pump occurs and is ignited. What is the maximum area of spill in (m^2) if flashover is to be avoided.
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
What is the salt usage for each regeneration if the system regenerated every 10 days? What size resin tanks (diameter, height) would be required for a duplex system with no redundancy?
Cooling at constant pressure followed by heating at constant volume. Calculate Q, W, change in U, and change in H for each of these processes, and sketch the paths of all processes on a single PV diagram.
The tape is stretched over three equal spans. Calculate the tape corrections under the following conditions at field, temperature = 85ºF, pull = 18kg, E= 2.109 x 10 6 kg/cm 2
Determine the number of completely mixed bioreactors (detention time of 45 min each) that would be required to meet the phenol discharge limit of 5 mg/L. The first-order removal rate constant is equal to 6.1 hr -1
A rotating shaft with an applied torque of 400 Newton-meters is held in place (stopped) by a shaft key. The diameter of the shaft is 15 centimeters. The shaft key has a length of 20 cm, and is square, with its width and height being 5 cm.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd