Estimate the new water depth upstream

Assignment Help Civil Engineering
Reference no: EM131151529

A clean earth river is 50 ft wide and averages 600 ft3 /s. It contains a dam that increases the water depth to 8 ft, to provide head for a hydropower plant. The bed slope is 0.0025.

(a) What is the normal depth of this river?

(b) Engineers propose putting flashboards on the dam to raise the water level to 10 ft. Residents a half mile upstream are worried about flooding above their present water depth of about 2.2 ft. Using Eq. (10.52) in one big half-mile step, estimate the new water depth upstream.

Reference no: EM131151529

Questions Cloud

What is the most appropriate length for the weir width b : It is desired to measure flow rates between 1500 and 3000 gal/min with only a 6-in change in upstream water depth. What is the most appropriate length for the weir width b?
Analyze change that has happened at your place of employment : Outline your suggestions for how to make the change more effective. Utilize a change theory to support your analysis and recommendations. Support each selected best practice with references from the professional literature. This section will be 2-..
What does it tell us about jefferson views : Thomas Jefferson wrote this secret message to Congress about the Lewis & Clark expedition in 1803; what does it tell us about Jefferson's views of westward expansion and Native Americans
Formulate the hypotheses : Formulate the hypotheses that can be used to determine whether the mean annual return for mid-cap growth funds differ from the mean for U.S. Diversified Equity funds.
Estimate the new water depth upstream : Engineers propose putting flashboards on the dam to raise the water level to 10 ft. Residents a half mile upstream are worried about flooding above their present water depth of about 2.2 ft. Using Eq. (10.52) in one big half-mile step, estimate th..
How would you describe your leadership style : Identify ways in which you collaborated with other professionals regarding your activities. Think about the stakeholders impacted by the change. How can the change theory you have chosen influence the success of a change project?
What is the balance of forces in such wave motion : A shallow-water wave propagates at the speed c0 (gy) 1/2. What makes it propagate? That is, what is the balance of forces in such wave motion? In which direction does such a wave propagate?
Whether or not apples product strategy should change : Based on the video, fast forward to current day and give your opinion on whether or not Apple's product strategy should change given its current rate of success.
Give three examples of rapidly varied flow : Give three examples of rapidly varied flow. For each case, cite reasons why it does not satisfy one or more of the five basic assumptions of gradually varied flow theory.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd