Estimate the land area (in acres) that must be purchased by a city to construct a new municipal landfill. The city has a stable population of 235,000 residents and the design criteria for the new landfill are as follows: MSW generation rate = 4.0 lb/(person-day); density of the compacted MSW in the landfill is 775 lb/yd3; the average depth of waste in the landfill is 50 ft; landfill life should equal 20 years. Finally, assume that 40% of the total land area must be used for roads, buildings and buffer zones.

Reference no: EM13298511

Questions Cloud

What is the value of the land : A piece of land produces an income that grows by 5% per annum. If the first year's income is $10,000, What is the value of the land?
How far into that region do the two blocks slide : Block 1, with mass m1 and speed 5.0 m/s, slides along an x axis on a frictionless floor and then undergoes a one-dimensional elastic collision with stationary block 2, How far into that region do the two blocks slide
Explain the evolution of patronage in fifteenth-century : Explain the evolution of patronage in fifteenth-century Italy. Identify specific patrons and discuss their commissions.
What is the best estimate for morningside cost of equity : Morningside nursing home,a not-for profit corporation,is estimating its corporate cost of capital.
Estimate the land area in acres that must be purchased : The city has a stable population of 235,000 residents and the design criteria for the new landfill are as follows: MSW generation rate = 4.0 lb/(person-day); density of the compacted MSW in the landfill is 775 lb/yd3
Define and identify the process as a spontaneous process : For the following, identify the process as a spontaneous process, a nonspontaneous process, or an equilibrium process at the specified temperature.
Calculate the maximum value of its speed : A 0.540-kg object attached to a spring with a force constant of 8.00 N/m vibrates in simple harmonic motion with an amplitude of 11.2 cm. Calculate the maximum value of its speed
Explain what mass of hclo4 should be present in 0.600 l : What mass of HClO4 should be present in 0.600 L of solution to obtain a solution with each of the following pH values pH = 2.70? pH = 1.70? pH = 0.60
How much energy do methanogenic bacteria get from h2 : How much energy do methanogenic bacteria get from using glucose and hydrogen (H2) to form methane and water as the products. Determine the net reaction (assume methane and water are the only products).

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the required diameter of steel tie rods

CALCULATE THE REQUIRED DIAMETER OF STEEL TIE RODS NECESSARY TO SUPPORT A BALCONY. EACH ROD, SUSPENDED FROM A ROOF TRUSS, SUPPORTS A FLOOR AREA OF 7.0m^2. THE COMBINED BALCONT FLOOR LOAD IS 10.5 kPa

  Determine maximum normal stress in each of links be and cf

Rigid members ABC and DEF are joined with steel links BE and CF using 25mm pins. The links are made of 25mm thick 50mm wide plates and are single shear. Determine the maximum normal stress in each of links BE and CF

  Tangential component of the acceleration of the sled

Knowing that the coefficient of kinetic friction between a sled and the run is 0.10 and that the speed of the sled is 25 ft/s at B, determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it pa..

  Compare the physical migration of workers

Compare the physical migration of workers during U.S. industrialization and present-day intellectual transition into a new type of workforce.

  Determine total stress and pore water pressure of sand

a layer of clay, 5m thick, overlies a deposite of sand, 5m thick, which is underlaid by rock. the water table in the sand is sub-artesian with a level at 2m below fround level. the saturated unit weights of the clay and sand are 21 and 16 KN/m^3 r..

  Determine the factors of safety against sliding

assume hydrostatic uplift varies uniformly from full hydrostatic head at the heel of the dam to zero at the toe. consider 1m length of dam.

  Depreciation using straight line-double declining balance

Calculate the depreciation using straight-line, double-declining-balance (DBB), and MACRS (current IRS regulation) methods; and tabulate the depreciation schedule.

  What is the total bod loading per day

The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?

  Travel of two particles problem

Two particles start from the same point along the same straight line and at the same instant. The first particle travels with a constant velocity v and the second with a constant acceleration.

  What do you mean by the term durability

What do you understand by the term durability? Compared to other considerations, how much importance should be given to durability in the design and construction of concrete structures?

  Determine direction of ground water flow through triangle

The depth to water in A is 210 ft, in B is300 ft, and C is 230 ft. Determine the direction of ground water flow through the triangle ABC and calculate the hydraulic gradient. If the aquifer hydraulic conductivity is 30 ft/day, estimate how far gro..

  Compute the radius of the curve

A simple curve has a central angle of 42degreess. A point Y is located 24m from the vertex and has a perpendicular distance of 3.00m from the back tangent.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd