a pipe carries 4750 LPM of crude oil at an average velocity of 2.5m/s. Estimate the inside diameter, wall thicknes and outside diameter of the pipe. The carbon steel pipe has tensile yield strength of 250 MPa. Assume safety factore of 2 and a corrosion allowance of 2mm. The maximumoperating pressure (MOP) is 55 bar.
A constant pressure container is filled with 1 kg of stainless steel and 0.5 kg of PVC (polyvinyl chlo- ride) both at 20C and 0.25 kg of hot air at 500 K, 100 kPa. The container is now left alone with no external heat transfer.
The center 0 of the wheel is mounted on the sliding block, which has an acceleration of a0= 8 m/s2 to the right. At the instant when theta=45 degrees, theta dot is = 3 rad/s and theta double dot is = -8 rad/s2.
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
Prepare an outline of the experimental design you will suggest to the plant manager. This outline should contain research rationale, aims and objectives, research methodology, nature of data analysis and interpretation, and possible outcomes/concl..
Sketch and annotate the wedge described above.
A rectangular steel plate with thickness t=0.625 inches is subjected to normal stresses sigma x and sigma y.The strain in the x direction is known to be 0.00065 and the strain in the y direction is known to be 0.0004.
Design a riveted end plated Connection between a beam ISHB-300 and the flange of the Column ISHB-200 to transfer a vertical factored shear of 125 kN and a factored hogging bending moment of 125kNm.Use Shop rivets of 20mm dia.
a new space age development corporation in wichita kansas has borrowed a sum of $4M from a friendly bank at an interest rate of 9%. the company has also borrowed another $1M from other sources at an interest rate of 8%.
How do you calculate the force of water hitting a concrete cylindrical pole. The velocity of the water is 2 ft/s, the depth of the water is 10 ft, and diameter of the pole is 3 ft. So what would be the total force exerted on the pole by the water?
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.
A tank has two identical orifices, each 5 cm in diameter in one of its vertical sides and are situated one above the other. The upper orifice is 4 m below the water surfaceand the lower one is 6 m below the water surface.
Design the shear reinforcement, vertical U stirrups for independent T beam. The beam spans 24 ft face to face between simple supports, has an effective depth d= 31 in.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd