A developing watershed has a total drainage area of 5000 acre. Of this total, 2000 acres are residential(CN=68), 500 acres are industrial (CN=88), and 2500 acres are forest with good cover (CN=55). For a design storm of with a total precipitation of 7 inches, estimate the direct runoff in inches.
Create a precedence (activity-on-node) diagram based off the attached activity list. You must follow the below recommendations as we discussed in class. 1) draw nodes as rectangles. It helps define the left side as starting and the right side as en..
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions.
A distance of 200 ft must be taped in a manner to ensure a standard deviation smaller than ± 0.03 ft. What must be the standard deviation per 100 ft tape length to achieve the desired precision?
After the Chernobyl accident, the concentration of 137Cs in milk was proportional to the concentration of 137Cs in the glass that cow consumed. The concentration in the grass was, in turn, proportional to the concentration in the soil.
An embankment for a highway 30m wide & 1.5m in a compacted thickness is to be constructed from a sandy trucked from a borrow pit. the water contenet of the sandy soil in the borrow pit is 15%& its void ratio is 0.69.
A concentrated downward force of 2000 lb. is located 6' from the left support, and a uniformly distributed load of 200 lbs./lin. ft. begins 6' to the right end of the member. What force must be applied at each connection to maintain equilibrium?
For each of the horizons, provide a description of the soil characteristics and briefly describe the environment where you would expect to find the horizon?
The flow in the river is 30ft^3/min and the first-order rate constant for disinfection is 6min^-1. 1)What kind of hydrodynamic model should you use. 2) write the mass balance equation for microorganisms in symbols at steady state. define symbols.
Given computer-generated direction field. Then sketch, by hand, an approximate solution curve that passes through each of the indicated points. Use different colored pencils for each solution curve.
Design a single angle strut connected to a gusset plate to carry 180k n factored load. The length of the strut between center to center intersection is 3m.
Account for chemical reactions, groundwater flows, streams, precipitation, evapotranspiration. Indicate any assumptions that can be made to simplify your equation.
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!