Earthwork
A pit, 750' long, 80' wide, and 2' deep, needs to be filled and compacted with select structural fill in Seattle, WA. The swell factor is 20 percent, and the shrinkage factor is 15 percent. The soil is to be retrieved from a location 5 miles away. It will be compacted using sheepsfoot compactors.
Source: Modified from the textbook, Mubarak, S. (2012). How to estimate with RSMeans data: Basic skills for building construction (4th ed.). Hoboken, NJ: John Wiley.
Using the provided data and CostWorks, estimate:
The total volume of soil to be retrieved
The total number of 12-cubic-yard dump trucks needed, each loaded at 110 percent capacity
The total bare cost and the total cost, including overhead & profit (O&P) for the entire operation
Submission Requirements:
Submit the CostWorks format, including all the data and calculations used to estimate the cost of the structural fill.
Write paper about relocation portion of termination
: Write a two page paper about the "Relocation" portion of the Termination & Relocation policy - Briefly describe the mechanics, destinations, and results of Relocation
|
Estimate the bare cost of steel doors
: Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of steel doors.
|
Calculate the consumer and producer surplus
: Calculate equilibrium price, quantity, consumer surplus and domestic producer surplus. Now imagine this country opens to free trade and the world price of steel is $500 per ton. Under free trade, calculate the consumer and (domestic) producer surp..
|
Estimate the bare cost of the diesel generator
: Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of the diesel generator.
|
Estimate the cost of the structural fill
: Submit the CostWorks format, including all the data and calculations used to estimate the cost of the structural fill.
|
What will happen to the yield on 10 year treasury bonds
: What interest rate would the bank have to charge to earn an expected rate of return on its loan equal to the T-bill rate - what would this indicate about investors expectations of future short term interest rates?
|
Estimate the total volume in thousand board feet of board
: For a location in Oshkosh, WI, estimate the total volume, in thousand board feet (MBF), for 100 pieces of 2" x 8", 16-feet-long board by using CostWorks.
|
What is the anticipated price of eggs
: Remember to show all of your work. Also remember that calculators are not permitted on exams, so you should try these by hand. Egg economists forecast that egg prices will rise 20% from 2012 to 2014. What is the anticipated price of eggs in 2014
|
Identify the genus and species of an unknown bacterium
: Many bacteria appear identical to others when examined under a microscope, so a microbiologist uses characteristics of bacteria to narrow down the possibilities to eventually identify the genus and species of an unknown bacterium.
|