Estimate the change in pressure over 100 m of pipeline

Assignment Help Civil Engineering
Reference no: EM13296682

Water at 20 degrees flows at a velocity of (V =) 2 m/s in a (D =) 250-mm diameter horizontal ductile iron pipe. Estimate the friction factor f in the pipe, and state whether the pipe is hydraulically smooth or rough. Compare the friction factors derived from (a) the Moody diagram and (b) the Colebrook equation. Estimate the change in pressure over (L =) 100 m of pipeline. How would the friction factor and pressure change be affected if the pipe is not horizontal but 1 m lower at the downstream section?

Reference no: EM13296682

Questions Cloud

Identify a business that has recently experienced challenges : Identify a business that has recently experienced challenges / issues or taken advantage of opportunities related to information systems/technology management from any newspaper or journal published in the last ten years.
Determine the expected ratio of phenotypes : Draw a 4x4 Punnett Square for the F2 generation (using the F2 gametes) and determine the expected ratio of phenotypes
State what is the mass of the steel bar : 120.mL of H2O is initially at room temperature (22.0 degrees C). A chilled steel rod at 2.0 degrees C is placed in the water. If the final temperature of the system is 21.4 degrees C, what is the mass of the steel bar?
Explain solid calcium oxide mixes with carbon dioxide gas : Solid calcium oxide mixes with carbon dioxide gas. Diphosphorus pentoxide is added to water. Hydrogen sulfide gas is bubbled through a solution of silver nitrate.
Estimate the change in pressure over 100 m of pipeline : Water at 20 degrees flows at a velocity of (V =) 2 m/s in a (D =) 250-mm diameter horizontal ductile iron pipe. Estimate the friction factor f in the pipe, and state whether the pipe is hydraulically smooth or rough.
What values of x is this triangle isosceles : The lengths of the sides of a triangle are 2x + 6, 4x, and 8x - 3. For what values of x is this triangle isosceles? Justify your answer.
Explain how many possible resonance structures : how many possible resonance structures can you draw for SO3 without violating the octet rule for S
Estimate force r on reducer when water flows through reducer : For any flowrate, the pressures in the pipes upstream and downstream of the reducer are expected to be related by using Bernoulli's equation where p1 and p2 are the upstream and downstream pressures and V1 and V2 are the upstream and downstream ve..
Explain what is the volume of ammonia gas measured : What is the volume of ammonia gas, measured at 489.9mmHg and 37.4oC, is required to produce 8.41g of ammonium sulfate according to the following balanced chemical equation

Reviews

Write a Review

Civil Engineering Questions & Answers

  Average shearing stress

Two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa.

  Determine the cartesian coordinates of the anchor

A fisherperson, pulling on the anchor cord, causes a force on the man of F=(40i+20j-50k)N. If the cord is 30m long,determine the Cartesian coordinates of the anchor at A. Assume that cord OA is a straight line.

  Determine the acceleration of the car

Motor M draws in the cable with an acceleration of 4 , measured relative to the 220 mine car. Determine the acceleration of the car. Neglect the mass of the pulleys.

  Probelm relating to fire a bullet

A bullet is fired from a height of 150m at a velocity of 300kmph at an angle of 35 upward. Neglecting air resistance. Find: a) total time of flight b) horizontal range

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  What is the station of the pt

a horizontal curve on a single-lane highway has its PC at station 124 + 10 and its PI at station 131 + 40. The curve has a superelvation of 0.06 ft/ft and is designed for 70 mi/h. What is the station of the PT?

  Does concentration exceed the 24-hr air quality standard

Suppose the average concentration of SO2 (SOsub2) is measured to be 400microgram/cu.m at 25degree celcius and 1 atm. Does this exceed the (24-hr) air quality standard of 0.14 ppm

  Regular hexagonal pyramid

A regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.

  Find the weight per lineal foot for a normal weight of beam

the unit weight of normal weight reinforced concrete is commonly assumed to be 150 lb/ft cubed. find the weight per lineal foot (lb/ft) for a normal weight reinforced concrete beam that: a. has a rectangular cross section 16 in.

  When will the queue clear

where u(t) is in vehicles per minute and t is in minutes. When will the queue clear?

  Average waiting time in the queue

What is the average length of queue, the average time spent in the system, and the average waiting time in the queue?

  Calculate the height above the waterline

A fully loaded, ocean going container ship is just stable about its longitudinal axis (roll). The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd