Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A proposed square footing 2 meters by 2 meters carrying a total load of 800 kN is to be constructed on a sand deposit. The depth of the footing will be 1 meter below the ground surface, and the unit weight of the sand is 17.5 kN/m^3. The modulus of elasticity of the sand was determined to be 10,000 kN/m^3 throughout. Using the Schmertmann's method, estimate the settlement of the footing four years after construction, using four 1 meter thick sublayers.
Precipitation station X was inoperative for part of a month during which a storm occurred. The respective storm at the three surrounding stations A,B and C were 98,80 and 110mm
determine the required spacing of shear reinforcement over the span of a 28-in-wide and 18-in-deep beam with a clear span equal to 30 ft. 2 in. the beam suports a total factored uniformly distributed load of 5.0 kips/ft.
Determine the support reactions at A, C, and E on the compound beam which is pin connected at B and D.
Design a concrete column of 14 ft high to support a dead load of 80 kips and a live load of 200 kips. f'c= 6,000 psi fy= 60,000 psi
A one meter diameter cylindrical mass is connected to a 2 meter wide rectangular gate. the gate is to open when the water level drops below 2.5 meters. Determine the required value of the mass of the cylinder in kgs.
Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.
The temperature of steam at the inlets of both turbines is 500 C, and the enthalpy of steam is 3027 kJ/kg at the exit of high pressure turbine, and 2385 kJ/kg at the exti of the low pressure turbine.
Two materials (wrought iron, ks = 0.046 mm, and galvanized iron, ks = 0.15 mm) are being considered for a new pipeline. The expected discharge is 0.15 m3/s. Both the head loss and cost are sought for.
Calculate the compacted cubic yards per hour if a compactor with a 5-ft drum width travels at 3 mph over a 10-in. lift of aggregate base course with 4 passes required to meet density specifications under average operating conditions.
If a temperature inversion forms over the city at a height of 0.70 km, how long will it take the carbon monoxide concentration to reach 50 ppm if the wind velocity is zero If the wind velocity is 1 m/s,
A biodegradable industrial wastewater (paper production) has a COD of 600 mg/ L. If the BOD progression follows first-order kinetics with a rate constant of 0.10 per day, determine the BOD5
What pressure gradient along a streamline, dp/ds, is required to accelerate water upwards in a pipe at 0.5 m/s^2 The incline is 1:10, i.e., 1 m upward for every 10 m horizontal
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd