Estimate energy release rate by using regression equation

Assignment Help Civil Engineering
Reference no: EM13300074

A concrete building has floor area 10 m by 20 m and is 4 m high. THe building has four windows with a height 1.6 m and a width 2 m. After 10 minutes gases in the room have an average temperature of 700 degree Celcius. Estimate the energy release rate by: (1) using the regression equation (2) Calculating the terms in the energy balance for the fully developed fire

Reference no: EM13300074

Questions Cloud

Calculate the fuel load density and the opening factor : A hotel room has a floor area of 10 m by 4 m and is 2.5 high and has a window which is 1.6 m high and 3 m wide. The room contains some furniture and other commodities containing 50 kg polyurethane with 25 MJ/kg and 350 kg wood with 18 MJ/kg.
Calculate how high is the image formed by the contacts : The far point of a nearsighted person is 8.5 m from her eyes, and she wears contacts that enable her to see distant objects clearly. How high is the image formed by the contacts
At what price did it sell shares to the market : Suppose that Hilton Web-Cams has made only one offering of common stock. At what price did it sell shares to the market?
How to calculate the grams of the compound that equals : To prepare 100 mL of a 0.500 M solution of this hydrated form requires 0.0500 moles of this salt. Calculate the grams of this compound that equals 0.0500 moles, showing all your calculations.
Estimate energy release rate by using regression equation : A concrete building has floor area 10 m by 20 m and is 4 m high. THe building has four windows with a height 1.6 m and a width 2 m. After 10 minutes gases in the room have an average temperature of 700 degree Celcius.
Ensure the effectiveness of the above principles : What strategies can you implement to ensure the effectiveness of the above principles? Which do you think would be the easiest to implement? Why?
Discussed as local problems caused by lack of regionalism : Detroit’s Empowerment Zones are described as: The generalized economic development term of art used to describe Empowerment Zones is: All of the following were discussed as local problems caused by lack of regionalism except:
How much energy is required to ionize this atom : A hydrogen atom is initially at n =3 state. How much energy is required to ionize this atom
The discounted payback period method : CEO of Acme, Inc. located in the United States. You use the discounted payback period method and accept all projects that payback in three years. You are considering a project that will cost $5,500,000 and will produce one cash flow that occur..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Tangential component of the acceleration of the sled

Knowing that the coefficient of kinetic friction between a sled and the run is 0.10 and that the speed of the sled is 25 ft/s at B, determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it pa..

  Derive the 3-h snyder unit hydrograph for a 100-square km

Derive the 3-h Snyder unit hydrograph for a 100-km^2 watershed where the main stream is 15 km long and the distance from the watershed outlet to the point on the stream nearest to the centroid of the watershed is 7 km.

  Calculating largest tolerable internal crack length

Calculate the largest tolerable internal crack length for a 7075-T651 aluminum alloy component that is loaded to a stress one-half of its yield strength without catastrophic fracture.

  Magnitude of the acceleration of the train

The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.

  What additional information would need to calculate stress

The bar under the applied force is now 2.448 meters long. Calculate the following for the bar: a) engineering stress, b) engineering strain, c) true strain, d) Young's modulus, e) What additional information would you need to calculate the true st..

  Using present worth analysis which process should b selected

The operating cost will be $10,000 per quarter with a salvage value of $25,000 after its 2-year life. Process B will have a first cost of $250,000, an operating cost of $15,000 per quarter and a $40,000 salvage value after its 4-year life.

  Principal stresses and the orientation of planes

A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..

  What is the amplitude of the vertical vibration

if the enginer is mounted floatiing on very weak spring, what is the amplitude of the vertical vibration of the engine? (b) if the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the con..

  Sufficient collapse strength

Would a 30 slot stainless steel screen (2.0 m long; located at the bottom of the well) have sufficient collapse strength for this application?

  Determine average time in the queue and in the system

The time between truck arrivals at the station is exponentially distributed with a mean arrival rate of 1.5 veh/min. the time it takes vehicles to be weighed is exponentially distributed with a mean rate of 2 veh/min.

  Determine the moment of the force about line joining points

the triangular plate ABC is supported by ball and socket joints at B and D and is held in the position shown by cables AE and CF. If the force exerted by cable AE at A is 1000N , determine the moment of the force about line joining points D and B.

  What landfill area will be required for solid waste disposal

Solid waste will be applied in 0.6 m "lifts" and will be compacted to a depth of 0.3 m. Daily cover soil will be applied to a depth of 0.15 m for the first four days of the operation in any week. At the end of the fifth day, a "weekly cover" layer..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd