Estimate benefit cost ratio for the project

Assignment Help Operation Management
Reference no: EM13100437

A recent project nominated for consideration at your company has a four-year cash flow of $20,000; $25,000; $30,000; and $50,000. The cost of the project is $75,000.
What is the benefit cost ratio for the project?

Reference no: EM13100437

Questions Cloud

What is the distance of closest approach : Two protons are moving directly toward one another. When they are very far apart, their initial speeds are 2.10 e 10^6 m/s. What is the distance of closest approach? Please show work in the answer because I am attempting to learn this.
Information about binomial-poisson probabilities : Two percent of the parts from a production process are defective. A sample of five parts from the production process is selected. What is the probability that the sample contains exactly two defective parts?
Probability for testing having defective brakes : A sample of 4 trucks is randomly selected. What is the probability that 2 of those tested have defective brakes.
Complete marketing plan for the project : The purpose of the Final Project is to apply the concepts and techniques of the module to the analysis of the development of a marketing plan.
Estimate benefit cost ratio for the project : A recent project nominated for consideration at your company has a four-year cash flow of $20,000; $25,000; $30,000; and $50,000. The cost of the project is $75,000.
Draw a free body diagram and vector diagram : How many packs of shingles can the contractor lift before he begins to slide down the roof assuming the following Contractor weights and values for the coecient of static friction exists between the contractor and the roof.
Determine the value of warrants for issue : Second issue consisted of 20m year bond with 6% annual option with warrants attached. Both bonds were issued at par ($1000). Determine the value of warrants for the second issue?"
Write an environmental and industry analysis : Based on Imperial Group (semi-truck manufacturer), use the following guidelines to write an environmental analysis and an industry analysis of 350-500 words.
Average cost of repairing a vcr : The average cost of repairing a VCR is $80 with a standard deviation of 19. if one VCR is repaired, find the probability the cost is between 70 and 90.

Reviews

Write a Review

Operation Management Questions & Answers

  How many machining centers must be devoted to widget

How many machining centers must be devoted to widget production during the given week, if there are 90 hours of available time on each machining center?

  Atr does not produce a competitive product

If Weiss adds a new plant addition and ATR does not produce a competitive product, Weiss expects a profit of $600,000; if ATR does not compete for this market

  Each division manager has instructed to decrease payroll

Several new employees, mostly women also minorities were hired to remedy the lack of diversity in the workplace. Due to financial difficulties within the organization, each division manager has been instructed to decrease his or her employee payro..

  Describe a project management methodology

Describe a project management methodology from either the literature or an organization of your choice. If it's from the literature, please submit the article.

  Illustrates what is maximum number of application per hours

Illustrates what is maximum number of application per hours that can be handled by present configuration of process.

  Computes a regression line for the data

Sales are given in millions of dollars; profits are in hundreds of thousands of dollars. Computes a regression line for the data. Elucidate what is your forecast of profit for a store with sales of $24 million? $30 million.

  Elucidate company is having difficulty preparing for future

Elucidate however, there is not enough money for a full-blown, cross-functional enterprise application, also you will need to limit first step to a single functional area or constituency. Illustrate what will you choose, also why.

  Given the volunteers you have the other time estimates item

Given the volunteers you have, the other time estimates are item K (2 hrs), item L (1 hour) also item M (4 hrs). Develop a time-phased assembly plan to prepare the gift bags.

  Discuss vendor relations in lean systems in terms

Elucidate how to manage an organization manufacturing motor cars in a turbulent also dynamic environment. Briefly discuss vendor relations in lean systems in terms of subsequent issues. Why are they important.

  Elucidate what should be the optimal batch size

Elucidate what should be the optimal batch size (Q) of clay tigers to be produced also shipped to the stores in every order. Keep 4 digits after decimal points in calculations.

  Illustrate what is maximum number of application process

Compute raw material price also usage (quantity) variance also direct labour quantity variance for Milton Industries' key product. Illustrate what is maximum number of application per hour which can be handled by present configuration of process.

  Producing one unit of product

Boilermakers, Inc. produces 3 products: A, B, and C. The unit prices of product A, B, and C are $5, $50 and $200, respectively. Assume that these products can be sold in unlimited quantities.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd