Reference no: EM13343643
The purpose of this assessment task is to evaluate your ability to prepare schedules of project expenditure, and curves showing projected cash flow and payments.
Instructions:
Given the assessment response you have produced above along with the 5 pack estimate and rate break up summaries, produce the following:
(0) a bar chart or network diagram for the project
(b) a time related baseline cash flow summary in tabular form for the project, showing critical milestones
(c) a baseline actual cost cash flow summary
(d) calculation of the projected monthly progress claim values
(e) from the above, produce a projected cash flow 'S' curve for the project
(f) modified cosh flows for early start and late finish risk scenarios
(g) modified cash flows for alternative cost based risk scenarios
(h) comparison of the above risk and time related cash flows and note differences
(i) comparison of the projected baseline income cash flow with the baseline actual cost cash flow
(j) a report on the purpose of monitoring expenditure schedules and their effectiveness
(k) pessimistic overdraft requirements
(I) the typical reasons why a cash flow can change, the procedure for revising the cash flow
Does this imply that the market price of global
: What was the change in Global Conglomerate’s book value of equity from 2008 to 2009 according to Table 2.1? Does this imply that the market price of Global’s shares increased in 2009? Explain.
|
What is the tendon stress
: A tendon is 5.2 cm long, has a cross-sectional area of 0.00006 m2 and has an average elastic modulus of 1.2 GPa. It is stretched with a force of 2400 N, What is the tendon stress
|
Forecast final cost management report comparing budgets
: A forecast final cost management report comparing budgets with final expenditure and a report on the effectiveness of comparing actual with budgeted costs
|
What is the rate of heat input
: A Carnot engine operating between energy reservoirs at temperatures 300K and 490Kproduces a power output of 800W. What is the rate of heat input
|
Estimate and rate break up summaries
: estimate and rate break up summaries, produce the a bar chart or network diagram for the project
|
Explain the 4-methylcyclohexene and water are being formed
: In the laboratory experiment, as the 4-methylcyclohexene and water are being formed, they are constantly being disstiled from the reaction mixture into a separate receiving flask. Explain how this process helps the reaction proceed with a higher y..
|
Find out the current sustainability reporting practices
: Find out the current sustainability reporting practices of companies listed in the Brazil. It is expected that you will provide insights using relevant accounting theories and relevant examples to explain current sustainability practices.
|
A breakdown in cost centre format of the budget
: A breakdown in cost centre format of the budget and a cost based risk assessment of the tender budget, including where the risk allocation would be made.
|
Prepare interim payment claims and rise
: Research and record your findings (in less than 100 words) on how a rise and fall cost adjustment is made and under what circumstances. Give an example of a rise and fall calculation.
|