Task - Civil Works Design

You are required to undertake a civil construction design project as outlined below. Your Assessor will take the role of the client for the purposes of this assessment task.

Design Specifications

1. The Problem

You are a civil designer working for the state department of transportation. You have been assigned responsibility for the design of a truss bridge to carry a two-lane highway across the river valley shown below.

2480_Bridge Configuration.jpg

 

2. Design Objective

Satisfy all of the specifications listed below, while keeping the total cost of the project as low as possible.

3. Bridge Configuration
1. The bridge may cross the valley at any elevation from the high water level to 24 meters above the high water level.
2. If the elevation of the bridge is below 24 meters, excavation of the river banks will be required to achieve the correct highway elevation.
3. To provide clearance for overhead power lines (shown above), the highest point on the bridge may not exceed an elevation 32.5 meters above the high water level (8.5 meters above the top of the river banks).
4. The bridge may consist of either standard (simple supports) or (arch supports). If necessary, the bridge may also use one intermediate , located near the centre of the valley. If necessary, the bridge may also use cable , located 8 meters behind one or both abutments.
5. Each main truss can have no more than 100 and no more than 200 .
6. The bridge will have a flat, reinforced deck. Two types of concrete are available:

1. Medium-strength concrete requires a deck thickness of 23 centimetres (0.23 metres).
2. High-strength concrete requires a deck thickness of 15 centimetres (0.15 meter).

7. In either case, the deck will be supported by transverse spaced at 4 metre intervals. To accommodate these floor beams, your must have a row of joints spaced 4 meters apart at the level of the deck. These joints are created automatically when you begin a new design.
8. The bridge deck will be 10 meters wide, such that it can accommodate two lanes of traffic.
4. Member Properties

• Materials. Each member of the truss will be made of either carbon steel, high-strength low-alloy steel, or quenched and tempered steel.
• . The members of the truss can be either solid bars or hollow tubes. Both types of cross-sections are square.

• Member Size. Both cross-sections are available in a variety of standard sizes.

5. Loads

The bridge must be capable of safely carrying the following loads:

• Weight of the deck.
• Weight of a 5-cm thick , which might be applied at some time in the future.
• Weight of the steel floor beams and supplemental bracing members (assumed to be
12.0 applied at each deck-level joint).
• Weight of the main trusses.
• Either of two possible truck loadings:

• Weight of one standard H25 truck loading per lane, including appropriate allowance for the dynamic effects of the moving load. (Since the bridge carries two lanes of traffic, each main truss must safely carry one H25 vehicle, placed anywhere along the length of the deck.)
• Weight of a single 480 kN Permit Loading, including appropriate allowance for the dynamic effects of the moving load. (Since the Permit Loading is assumed to be cantered laterally, each main truss must safely carry one-half of the total vehicle weight, placed anywhere along the length of the deck.)

6. Structural Safety

The bridge will comply with the structural provisions of the state specified standards, to include:

• Material densities
• Load combinations
• Tensile strength of members
• Compressive strength of members

7. Cost

The cost of the design will be calculated using the following cost factors:

• Material Cost:

• Carbon steel bars - $4.50 per kilogram
• Carbon steel tubes - $6.30 per kilogram
• High-strength steel bars - $5.00 per kilogram
• High-strength steel tubes - $7.00 per kilogram
• Quenched and tempered steel bars - $5.55 per kilogram
• Quenched and tempered steel tubes - $7.75 per kilogram

• Connection Cost: $500.00 per joint
• Product Cost: $1000.00 per product
• Site Cost:

• Reinforced concrete deck (medium strength) - $5,150 per 4-meter panel

• Reinforced concrete deck (high strength) - $5,300 per 4-meter panel
• Excavation - $1.00 per cubic meter (See the Site Design Wizard for excavation volume)
• Supports (abutments and pier) - Cost varies (See the Site Design Wizard for specific values)
o $6,000 per anchorage

Required:

1. Make a detailed list of all constraints and requirements to the bridge design.

2. Prepare functional specifications

3. Present at least 2 designs to meet the design specifications. The designs are to include, as relevant:

• calculations, which may include:

• loads
• sheer forces
• bending moments
• stresses
• construction materials and services quantities
• construction cost estimates

• recommended sizing of components
• recommended materials
• recommended reinforcement sizing and location
• drawings
• risk assessment of:

• the existing conditions
• the application of the design
• maintainability of the works

• health, safety and environmental requirements
• contribution to ancillary documentation, which may include:

• design notes
• construction notes
• supplementary drawings
• input to the specifications

Note: The designs, and their development, should comply with relevant requirements including:

• legislative, organisational and site requirements and procedures
• manufacturer's guidelines and specifications
• Australian standards
• Code of practice
• Employment and workplace relations legislation
• Equal Employment Opportunity and Disability Discrimination legislation

Attachment:- Civil Works Design.rar

 

Reference no: EM133139427

Questions Cloud

Consideration of an organisational hierarchy : Explain how complaints received may be communicated in consideration of an organisational hierarchy.
What are breakeven sales in dollars : The selling price per dozen is $5.00, variable costs are $3.00 per dozen, and tonal ?xed costs are $1,000. What are breakeven sales in dollars
Identify the amount of revenue to be recognised : A travel agent sells 4 theme park tickets at £250 each on behalf of Disneyland. Identify the amount of revenue to be recognised
Reflect on the role of slavery in southern life : Reflect on the role of slavery in southern life (both material and cultural levels).
Employment and workplace relations legislation : The cost of the design will be calculated using the cost factors - Make a detailed list of all constraints and requirements to the bridge design
Explain the basic purpose of a database : xplain the basic purpose of a database (DB) as well as the costs and benefits to the management of wine company
Realigning HR Practices at Egan Clothiers : What are the pros and cons of Egan's performance appraisal system? Do you think it identifies the best employees?
Impact of a global marketplace on total rewards : Exhibit 16.1 shows how people get paid around the world depends on variations from four general aspects, such as economic, institutional, organizational, and em
What ae the other methods to find base pay : What ae the other methods to find base pay

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd