Reference no: EM13981627
Design Specifications and Distributed Systems
The student will learn how to provide management for projects that employ the methods of data gathering, fact-finding and input/output design. Using case problems, students will implement the techniques of system development and project management. In preparation for the role of a systems analyst or designer students will be expected to use all of the skills and techniques of an advanced analyst to research a complex project.
The student will choose one of the subjects and develop a PowerPoint presentation that will contain, a problem statement, facts gathered from the subjects for the project, assumptions based on the project chosen, discussion of the project, a conclusion and recommendations based on the project chosen. The student will formulate the paper as a decision maker preparing to recommend more than one course of action for a corporate board to select. The selected project will require the student to prepare a request for proposal to be submitted to various vendors that can act as consultants or solution providers for the project.
CHOOSE ONE OF THESE SUBJECTS FOR YOUR PROJECT
Situation #1: A system for maintaining academic, billing, scheduling, and financial records of some 20,000 students at a major University.
Situation #2: A medical and dental claims administration and payment system for 14,000 employees of a major appliance manufacturer.
Situation #3: A system for tracking about 1,000 job applications at six different branches of a nationwide retail chain and matching the applicants to about 50 job openings per month.
The individual project chosen must contain the following PowerPoint slides in the order noted below.
There should be a minimum of 10 slides and a maximum of 15 slides. Be sure you have a slide for each of
the areas shown below:
- Title Page
- Table of Contents
• Executive Summary (This section should be an overview of the total project; it should highlight the significant points of the other sections of the plan. This summary may be in either synopsis or narrative form.)
• Developing the problem statement.
• Facts gathered for the project
• Assumptions
- Discussion of the project, problem statement, facts and assumptions:
• Conclusion and Recommendations
• Appendix of Supporting Documents
90-100% Project meets all requirements in length and content; shows excellent understanding of the material; AND grammar, structure, and spelling are at college level.
80-89% Project meets all requirements in length and content; shows a good understanding of the material; AND grammar, structure and spelling are at college level.
70-79% Project meets all requirements in length and content; shows some understanding of the material; AND/OR grammar, structure, and spelling need some improvement.
63-69% Project meets bare minimum requirements in length and content; lacks some key understanding of the material; AND/OR grammar, structure and spelling need a lot of improvement.
0-62% Project does not meet minimum requirements in length and content; OR show little understanding of the material; OR grammar, structure, and spelling are not on college level.
Please provide the references
What strategies can you use to overcome language barriers
: Think of a culture of interest to you. Describe several things you could learn from that culture to enrich your life, deepen your business expertise, and improve your communication skills.
|
What is a market demand driven project
: Market demand is often discussed during the conception of a project. What is a market demand driven project
|
Deliverables associated with coding
: Q1. There are deliverables associated with coding, testing and installation. Discuss the deliverables for coding, testing and installation and explain how each is necessary before software implementation
|
Wayne owns a shaved ice stand
: Based on the above Excel Problem; if the total capacity for this business is 725 will you stay in it? If you want to stay in it what price you need to obtain a break-even point of 725?
|
Employ the methods of data gathering
: The student will learn how to provide management for projects that employ the methods of data gathering, fact-finding and input/output design. Using case problems, students will implement the techniques of system development and project management.
|
Determine the resultant and equilibrant vector
: Using the graph method (head-to tail method or parallelogram method), determine the resultant and equilibrant vector (magnitude and direction)
|
Defines the risk responses that are used in the project
: The subsidiary plan defines the risk responses that are to be used in the project for both positive and negative risks is called the
|
Based on the excel problem solved
: If you compare the trend of cost/unit versus the profit/unit using a scatter chart, what can you infer from their behavior?
|
How much energy will be lost due to friction
: I broke the Forces into their components: Fx=70N, Fy=40N. For the next part of this problem I used F=ma, and the horizontal force of 70N and found an acceleration of 5.8m/s^2, and this is where I think I went wrong, as after this all of my number..
|