A 1600 ft long sag verical curve (equal tangent) has a pvc at station 1200+00 and elevation o 1500 ft. the initial grade is -3.5% and the final grade is 6.5%. determine the elevation and stationing of the low point, pvi and pvt.
What is the maximum safe speed around the curve? If the speed limit on the roadway is 60mph, what action should be taken by the engineer?
A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.
A company that manufactures regenerative thermal oxidizers made an investment 10 years ago that is now worth $1,300,000.
Writing case study about bridge collapse
Measurements indicate that to cause this flow the force acting on the contents of the control volume is 40i lb. Determine the net rate of flow of linear momentum through the control surface.
The section of the plywood in the 3rd quadrant is sawed off and the resulting piece is then glued squarely over the 4th quadrant portion of the plywood with glue of negligible weight.What are the x- and y-coordinates of the resulting center of gra..
Calculate the depreciation using straight-line, double-declining-balance (DBB), and MACRS (current IRS regulation) methods; and tabulate the depreciation schedule.
A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees?
Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?
Differentiate between construction loan and mortgage loan based on your understanding (using your own words). Define the following terms in your own words: (a) cap rate, (b) economic value of a project, and (c) gap financing.
You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd