Question 1: The input- Output characteristics of 2 generating plants are given as follows;

H1(MBtu/h) = 749.55 + 6.95P1 + 9.68x10-4 P12 + 1.27x10-7 P13

H2 (MBtu/h) = 1285 + 7.05P2 + 7.37x10-4 P22 + 6.45x10-8 P23

Annual fuel cost is 1.2$/MBtu ; Incremental fuel cost is 9.5$/MWh ;Load Demand = 1000MW.

Calculate the Economic loading from generator 1&2 using analytical method? Show with a proper method how power balance can be obtained in this case.

Question 2: The cost function of 3 generating units are given as following;

C1=7.2P1+0.284P12 + 300 $/h [P1 Min =50MW ;P1 Max=300MW] C2=6.85P2+0.388P22+200 $/h [P2 Min =50MW ;P2 Max=400MW] C3=5.97P3+0.26P32 +100 $/h [P3 Min =50MW ;P3 Max=500MW]

Which generators are to be committed according to priority list method, if load demand is 750MW.

Prepare the shut down algorithm based on Brut force technique method with sufficient calculations if load demand is reducing from 1000MW to 750 MW and maintained in lower limits for 2 hours 45 minutes. Minimum down time for the generator 1, generator2 and generator 3 are 90 minutes, 125 minutes and 100 minutes respectively. Transition cost for generator1,generator2 and generator3 are 250$/h, 300$/h and 450$/h respectively.

What will be your decision as an operational Engineer about shut down of generator in the above mentioned problem and justify with reasons?

Question 3: Prepare a flow chart for the contingency analysis program to be applied in the SCADA system in the load dispatch centre which has a 6 bus system to check the outages with following conditions given below ;
(i) Voltage variation allowed in each bus is + 6% from the Normal 33kV.
(ii) Nominal current rating +10% of rated current in a total load of 300kw load in each phases for 2minute duration.
(iii) Frequency variation allowed is +0.15% of normal 50Hz frequency.

If nominal current in the transmission system goes exceeding the short term ratings set in contingency analysis program and warning display appears in SCADA, What will be the possible outage in the system

and what are the control actions you will adopt as an operational Engineer for bringing this state of power system to Normal state of operation?

Question 4: Prepare a Capacity Outage Probability Table for the Generation system with following units ; Unit 1 ( 15MW with Availability =96%)
Unit 2 ( 10MW with Availability =94%) Unit 3 ( 20MW with Availability =90%) Unit 4 ( 30MW with Availability =92%)

Prepare a flow chart for finding the reliability index of your generation system from the datas accessible to you from Nearest Load dispatch centre.

Attachment:- Power System Operation and Reliability.rar

Reference no: EM132509755

Questions Cloud

The change models of kotter and lewin : Al-Haddad & Kotnour (2015) describes the change models of Kotter and Lewin. Explain the impact of each model on implementing change and resistance to change.
Calculate the income tax expense on continuing operations : Blossom Corporation reported the following pre-tax amounts for the year ended August 31, 2021: Calculate the income tax expense on continuing operations
What should be its stock price today : The company recently paid a dividend of $3 to shareholders. If the company's required rate of return is 8%, what should be its stock price today?
What would be the opportunity cost of each unit delivered : The special order is received from the overseas customer. What would be the opportunity cost of each unit delivered to the overseas customer?
EEPW 4355 Power System Operation and Reliability Assignment : EEPW 4355 Power System Operation and Reliability Assignment Help and Solution, Shinas College of Technology - Assessment Writing Service
Record the reacquisition of the shares : On December 31, 2020, Sandhill Treats Limited reported 37,000 common shares issued. Record the reacquisition of the shares
Communications and task management : What tools are they using for communications and task management? What are the advantages and disadvantages of managing a virtual team?
Determining the bond yield to maturity : A 4 year bond pays 4% annual interest (paid semi annually). It currently sells for $872.25. What is the bond's yield to maturity?
Compute the return on in vestment for each division : If performance is being measured by residual income, which division or divisions will probably accept the opportunity? Reject it? Why

Reviews

Write a Review

Other Engineering Questions & Answers

  Discuss dress code for campbellsville university staff

What steps might you take to gain the cooperation of the third party after the policy has been initiated.dress code for Campbellsville University Staff

  Discuss about cyberstalking and cyberbulling

How do you believe Websites such as Facebook and Twitter only exacerbate the problem with children using social media platforms?

  Program to simulate a drink-dispensing machine

Simulate a drink-dispensing machine and to evaluate its operation using the development system boards in Embedded Systems laboratory. The inputs to the drink-dispensing machine are simulated by 5 pushbutton switches on PORTD.

  Determine the rate of energy destruction

If the temperatures of the inner and outer surfaces of the bottom of the pan are 104°C and 105°C, respectively, determine the rate of energy destruction within the bottom of the pan during this process, in W. Take T0 = 25°C.

  Compare project to project portfolio risk management

What mitigation actions can organizations take to maximize opportunity and reduce threats from risks to a project portfolio? Describe at least 2 action

  Compute the transformation matrix for a lamina oriented

Compute the reduced stiffness [Q] and compliance [S] matrices, and the intralaminar shear stiffness [Q∗ ] and compliance [S ∗ ] matrices for a lamina with E1 = 35 GP a, E2 = 3.5 GP a, ν12 = 0.3, G12 = 1.75 GP a, G23 = 0.35 GP a.

  Discuss a potential timing issue

Discuss a potential timing issue that could occur early in the project and/or one that could occur at the end of a project. How would you address these issues

  Find the digital input rate that produces

Find the proper valve size in inches for pumping a liquid flow rate of 580 gal/min with a maximum pressure difference of 50 psi. The liquid specific gravity is 1.3.

  How frequently should the data be updated

Is the information requested by the marketing department sufficient to determine the best way to promote sales? Explain. Is one dashboard sufficient for the marketing department? Explain.

  Class of combinational logic consists of decision circuits

Listthe type of equipment or components that you will be using? Where will you find these components? How will you use these components in Multisim/VHDL? Explain any adjustments required such as tolerances.

  Briefly comment on the rip protocol

ECTE 329 - computer network - Briefly comment on the RIP protocol. You may refer to your experimental work and external sources.

  Calculate the total number of hours spent on each work order

You work in a company that hire and pay workers on weekly basis. At the end of each week you have to provide the total number of hours those workers spent in order to pay them. You will be provided with one Excel file at the end of each week that ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd