Early project cost and schedule analyses

Assignment Help Civil Engineering
Reference no: EM13954507

Individual Assignment:

BIM Drivers and Applications

1) Read Chapters 1 and 2 of the Penn State PxP Guide.

2) Read the provided case study on the University of Colorado-Denver Project.

The case study names the following participants:
• University of Colorado
• Fentress Bradburn Architects Inc.
• Martin & Martin Structural Engineers
• Mortenson Construction
• Sturgeon Electric
• Western States Fire Protection
• U.S. Engineering
• Cives Steel Company

The Case study describes the following BIM uses (some BIM use names differ slightly from those used in class):
• Early Project Cost and Schedule Analyses
• Model Based Coordination
• Constructability studies
• Model Based Fabrication
• Shop Drawings
• Assembly instructions
• 4D Simulation
• RFI Submission
• Facility Management

3) For each BIM use described in the case study, identify which project stakeholders participated and the nature of their participation (e.g. providing models, using models and the personal benefits (i.e. to each company) in participating.

Provide your answer using no more than two pages and in your own words.
For this assignment, it is appropriate to answer using a table and sentence fragments. See the model answer on page two of this assignment. You will not be penalized for basing your response to the RFI Submission BIM use on the model answer.

Attachment:- case study U of Denver.rar

Reference no: EM13954507

Questions Cloud

Create a multi-level work breakdown structure : This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written f..
Reporting financial performance : The introduction of FRS 3, Reporting Financial Performance, has resulted in a considerably expanded profit and loss account with related disclosures and a new primary statement. The standard is intended to be based on the 'all-inclusive' concept o..
Project for planning of fiftieth wedding anniversary : Project for planning of 50th wedding anniversary. Ensure your WBS has all the estimated activities and durations, are logically sequenced, and milestones defined.
Pension scheme on a monthly basis : You are the financial controller of C Ltd, a company which has recently established a pen- sion scheme for its employees. It chose a defined benefit scheme rather than a defined contribution scheme. C Ltd makes payments into the pension scheme on ..
Early project cost and schedule analyses : Identify which project stakeholders participated and the nature of their participation - providing models, using models and the personal benefits.
Very good example of a well written email : Do some reputable research to support your response. And, make sure you follow all the guidelines for writing an effective email discussed in the chapter and in my lecture.
How much air would you have to sample : Assuming you have a detection limit (lowest activity you can measure to a predetermined confidence level) of 20 Bq on you filter measuring system, how much air would you have to sample through your filter to be able to detect the naturally occurri..
Profit and loss account of diverse plc : Compute the charge in the profit and loss account of Diverse plc in respect of the pension costs for the year to 31 December 1998. Compute the pension asset or liability which would appear in the balance sheet of Diverse plc at 31 December 1998 a..
How much time spiff measure for his trip from earth to mars : In the Bohr model of the atom, the energy of the electron depends only on one quantum number, n. In the Paschen series of the spectral wavelengths, the electronic transitions always terminate at the n=3 level. Calculate the energy of the electron ..

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the rated flywheel power for a cat 834h 4 wheel

What is the rated flywheel power for a CAT 834H 4 wheel tractor equiped with converter drive? What are the maximum speeds, for this machine in each of the four forward gears?

  Develop technical competence in problem formulation

Develop your knowledge of key principles relating to wastewater system design - Develop technical competence in problem formulation and solution in this discipline area.

  Estimate the formaldehyde concentration in the lake

A factory discharges its waste into a river upstream from a lake. The discharge release rate is 2 kg formaldehyde per day. The decay is a first order process with a decay rate of 0.000005/s.

  Determine the effective stress strength parameters

cell pressure kN/m2 100 200 300 ultimate deviator stress kN/m2 137 210 283 ultimate pore pressure kN/m2 28 86 147 determine the effective stress strength parameters

  Calculate the monthly loan payment to repay

It is not uncommon to borrow $100,000 or more to purchase a home. Banks typically offer 15-,20-, and 30- year loans. a) Calculate the monthly loan payment to repay a $100,000 home loan

  Determine the value for cohesion intercept c

Separate triaxial compression tests are performed on identical soil samples. The soil is a saturated mixed soil. Both tests follow the procedure for consolidated-undrained conditions.

  Determine the most desirable alternative based on the result

Annual rare based on amount of products which can ordinarily be shipped each year as a function of the amount of vehicles or service purchased with the first cost and the M&O costs. Using a MARR of 15%, calculate the equivalent uniform annual cash fl..

  Show that the car must have exceeded the speed limit of 55

highway patrol officer, you are patricipating in a speed trap. A car passes your patrol car which you clock at 55 mph. One and a half minutes later, your partner in another patrol car situated two miles away from you

  Determine the maximum external pull the ferrari has

A ferrari with 808 hp has a max. speed of 211 mph at 6,300 rpm. the Ferrari weighs 4,155 lb/ton and is operated over a smooth concrete road with a rolling resistance of 40 lb/ton and a slope of 3%.

  Compute the flows with return periods of 1 5 and 15 years

The table below provides the flows for the Llano River in Texas for the period of 1951 to 1970. Using the simplified frequency analysis method show in class (Weibul method)

  Calculate the volume of gasoline in the tanker at the time

If the weight of the empty truck and tanker was 120 kN, please calculate the volume of gasoline in the tanker at the time of the crash in m^3. Furthermore, at today’s gasoline price of $2.58/gal, plus the cost of the 18-wheeler (purchase price of $98..

  How long must it be maintained at this temperature to

Achieve a concentration of 0.5%wt of carbon at a depth of 0.2 mm below the surface of the slab of a metal. The initial concentration of carbon in the metal is 0.1wt%. We first do an experiment by applying a concentration of 5%wt of carbon at the surf..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd